
Durham Region
Building and renovating in Scugog
Permit fees, development charges, additional unit rules and the conservation authority in Scugog, Ontario, each linked to its source and dated.
- Municipality
- Township of Scugog
- Region
- Durham Region
- Facts checked
- 5 October 2026
Includes Port Perry.
Confirm with the building department before you apply.
More about building in Scugog
Architectural design and permit drawings in Scugog
The Scugog rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the architectural design and permit drawings page.
Basement renovations in Scugog
The Scugog rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the basement renovations page.
Bathroom renovations in Scugog
The Scugog rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the bathroom renovations page.
Design-build in Scugog
The Scugog rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the design-build page.
Kitchen renovations in Scugog
The Scugog rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the kitchen renovations page.
Whole-home renovations in Scugog
The Scugog rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the whole-home renovations page.
Permits and rules in Scugog
Applying for a permit in Scugog
| Item | What applies | Source |
|---|---|---|
| Where to apply | Cloudpermit | scugog.caChecked 5 October 2026In the source's wordsThe Township of Scugog is pleased to offer residents, builders, and the business community Cloudpermit - an online system to apply for and track your building permits. |
| Building department | Township of Scugog: building and renovating | scugog.caChecked 5 October 2026In the source's wordsThe Building department is a division of the Township of Scugog's Development Services department. |
| Phone | 905-985-7346 ext. 169 | scugog.caChecked 5 October 2026In the source's wordsPlease contact the Building Department at 905-985-7346 ext. 169 or bdepartment@scugog.ca |
| bdepartment@scugog.ca | scugog.caChecked 5 October 2026In the source's wordsPlease contact the Building Department at 905-985-7346 ext. 169 or bdepartment@scugog.ca | |
| Fee by-law | Building By-law 18-24 (passed April 29, 2024), Schedule A, fees as of January 1, 2026 | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsRequired Building Permit Fees as of January 1, 2026 |
| Permit decision time (Ontario) | 10 days for a house where no dwelling unit is located above another dwelling unit (except retirement homes), and for a detached structure serving it up to 55 m² building area | publications.gov.on.caChecked 5 October 2026In the source's wordsa house where no dwelling unit is located above another dwelling unit. |
Building permit fees
| Item | What applies | Source |
|---|---|---|
| New house permit fee | $20.43 per m² | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsGroup C - Residential Occupancies ... Other Residential Buildings $20.43 |
| Addition permit fee | $20.43 per m² | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsNew Construction and Additions (for each m2 of GFA or part thereof) ... Other Residential Buildings $20.43 |
| Interior alteration permit fee | $8.25 per m² | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsOther Alterations and Renovations to Existing Buildings Not Provided for in Items 7 to 9 $8.25 / m2 |
| Basement finish permit fee | Not verified yet | Not verified yet |
| Additional residential unit permit fee | Not verified yet | Not verified yet |
| Accessory building permit fee | $7.02 per m² | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsPorches, Carport/Garages, and Storage Sheds $7.02 |
| Deck | $145.12 flat | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsMinor Residential Structures, including: Decks $145.12 Flat Fee |
| Minimum permit fee | $180.10 flat | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsthe minimum permit fee for any permit application for work proposed in Group C residential occupancies shall be $180.10. |
| Plumbing, per fixture | $226.80 flat | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsPlumbing $226.80 Flat Fee |
| Demolition | $156.86 flat | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsDemolition Permit $156.86 - Residential |
| Work started without a permit | Greater of $1,533 or 150% of permit fee (first offence) | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsBuilding Permit Fee Increased by $1,533 or150% of the Applicable Building Permit Fee for first offence. |
| Lot grading deposit | $10,000 deposit | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsLot Grading Security if required $10,000 |
Fees as the municipality's 2026 schedule prints them. A rate with no single number shows the rule instead.
Development charges on a new house
| Item | What applies | Source |
|---|---|---|
| Scugog (municipal) | $33,581 | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsSingle / Semi Detached Dwelling $33,581 $7,535 $76,227 $117,343 |
| Durham Region (regional) | $76,227 | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsRESIDENTIAL WITH WATER SUPPLY AND SANITARY SEWER SERVICED LOTS ... Single / Semi Detached Dwelling $33,581 $7,535 $76,227 |
| School boards (education) | $7,535 | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsSingle / Semi Detached Dwelling $33,581 $7,535 |
| Total, as published | $117,343 | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsSingle / Semi Detached Dwelling $33,581 $7,535 $76,227 $117,343 |
| Additional units | Second and third units and one ancillary-building unit exempt per DCA s.2(3)-(3.3) | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsA second residential unit in an existing single-detached house, semi-detached house or rowhouse on a parcel of land on which residential use, other than ancillary residential use, is permitted |
| Additions to an existing house (Ontario) | Enlarging an existing residential unit (e.g., an addition) does not trigger development charges | ontario.caChecked 5 October 2026In the source's wordsdoes not satisfy the requirements of subsection (2) if the only effect of the action is to permit the enlargement of an existing residential unit |
| When charges are paid (Ontario) | Since Nov 3, 2025, DCs on residential development (other than rental) are paid in full at the earlier of occupancy permit issuance or first occupancy, instead of at building permit | ontario.caChecked 5 October 2026In the source's wordsshall be paid in full on the earlier of, (a) the day a permit is issued under the Building Code Act, 1992 authorizing occupation of the building; and (b) the day the building is first occupied. |
Per single or semi-detached house, rates as of 2026-07-01.
Zoning and minor variances
| Item | What applies | Source |
|---|---|---|
| Zoning by-law | Zoning By-law 14-14 (office consolidation December 2025) plus ADU Zoning By-law 12-25 | scugog.caChecked 5 October 2026In the source's wordsScugog Council passed Zoning By-law No. 12-25 to permit Additional Dwelling Units within Settlement Areas as well as within some Rural Areas, subject to criteria. |
| Lot coverage (typical residential zone) | 45% (urban residential zones R1, R2, R3 serviced, RM1, RM2, RM4) | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsMaximum Lot Coverage of all Buildings 45% except in the R3, where the Lot is serviced by private water and/or private waste disposal, and RM3 Zones |
| Height (typical residential zone) | 10 m (urban residential zones) | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's words(d) Maximum Building Height 10m |
| Minor variance (Committee of Adjustment) fee | $2,760 flat | media-001-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsMinor Variance (Note 4) ... Residential $2,760 |
| Committee of Adjustment | Applications, schedule and decisions | scugog.caChecked 5 October 2026 |
Additional units: basement apartments, garden suites, coach houses
| Item | What applies | Source |
|---|---|---|
| Homes allowed on one lot | 3, the house included | scugog.caChecked 5 October 2026In the source's wordsyou may be permitted up to two (2) ADUs on your property in a Settlement Area such as Port Perry. |
| Rule | Up to two ADUs in settlement areas such as Port Perry; at least one must be in or attached to the main house | scugog.caChecked 5 October 2026In the source's wordsyou may be permitted up to two (2) ADUs on your property in a Settlement Area such as Port Perry. |
| Rule (2) | Shoreline Residential (SR): one ADU, inside the house only, lot at least 3,000 m² | scugog.caChecked 5 October 2026In the source's wordsYour property must have a minimum lot area of 3,000 square metres (32,292 square feet) for an ADU to be permitted. |
| Rule (3) | Agricultural/Rural Residential: one ADU within the existing footprint of the house or an accessory building legally existing on July 1, 2017; outside the Greenbelt NHS | scugog.caChecked 5 October 2026In the source's wordsAn ADU is only permitted within the existing footprint of the primary residential dwelling OR within the existing footprint of a detached accessory building or structure on existing lots of record |
| Rule (4) | Oak Ridges Moraine zones: one ADU inside the existing footprint of a house that existed on November 15, 2001; no detached ADUs | scugog.caChecked 5 October 2026In the source's wordsAn ADU is only permitted within the existing footprint of the primary residential dwelling on existing lots of record, provided it was zoned for such use and legally existed as of November 15, 2001. |
| Rule (5) | Parking: one space per ADU on top of two for the main dwelling; tandem allowed | scugog.caChecked 5 October 2026In the source's wordsEach Additional Dwelling Unit is required a minimum of one (1) parking space on the lot. |
| Rule (6) | Detached ADU: 3 m interior side and rear setbacks; max height 7 m | scugog.caChecked 5 October 2026In the source's wordsMinimum Interior Side Yard Setback of 3 metres ... Minimum Rear Yard Setback of 3 metres |
| Rule (7) | ADUs must be registered before occupancy; $50 registration fee waived for six months | scugog.caChecked 5 October 2026In the source's wordsall ADUs must be registered prior to occupancy to demonstrate compliance with zoning, building, and fire safety regulations. |
| Rule (8) | No ADU on hazardous lands; outside Port Perry the lot must front on a year-round maintained public road | scugog.caChecked 5 October 2026In the source's wordsIf the property is considered hazardous land, an ADU is not permitted. |
| Three units as of right (Ontario) | On a parcel of urban residential land, municipalities cannot prohibit: 2 units in a detached/semi/rowhouse plus 1 unit in an ancillary building, OR 3 units in the house with none in an ancillary building | ontario.caChecked 5 October 2026In the source's wordsthree residential units in a detached house, semi-detached house or rowhouse on a parcel of urban residential land, if no building or structure ancillary to the detached house, semi-detached house or rowhouse contains any residential units |
Conservation authority and environmental rules
| Item | What applies | Source |
|---|---|---|
| Conservation authority (1) | Kawartha Conservation (most of Scugog) | scugog.caChecked 5 October 2026In the source's wordsThe Township of Scugog has three (3) Conservation Authorities, being Kawartha Conservation, Lake Simcoe Region Conservation Authority, and Central Lake Ontario Conservation Authority. |
| Conservation authority (2) | Lake Simcoe Region Conservation Authority (LSRCA) | lsrca.on.caChecked 5 October 2026In the source's wordsCouncillor Durham Region (Scugog) |
| Conservation authority (3) | Central Lake Ontario Conservation Authority (CLOCA) | cloca.comChecked 5 October 2026In the source's wordsOur municipal partners include ... Municipality of Clarington and Townships of Scugog and Uxbridge. |
| When its permit is needed | Any development in Kawartha Conservation's regulated area (O. Reg. 41/24, since April 1, 2024) | kawarthaconservation.comChecked 5 October 2026In the source's wordsYou will need a permit for any development that occurs within Kawartha Conservation's Regulated Area. |
| From 2027-02-01: Kawartha Conservation (most of Scugog) | Becomes part of the Eastern Lake Ontario Regional Conservation Authority (Conservation Authorities Act, Bill 97) | ontario.caChecked 5 October 2026In the source's words“transition date” means February 1, 2027 or such later date as may be prescribed by the regulations |
| From 2027-02-01: Lake Simcoe Region Conservation Authority (LSRCA) | Becomes part of the Lake Huron Regional Conservation Authority (Conservation Authorities Act, Bill 97) | ontario.caChecked 5 October 2026In the source's words“transition date” means February 1, 2027 or such later date as may be prescribed by the regulations |
| From 2027-02-01: Central Lake Ontario Conservation Authority (CLOCA) | Becomes part of the Central Lake Ontario Regional Conservation Authority (Conservation Authorities Act, Bill 97) | ontario.caChecked 5 October 2026In the source's words“transition date” means February 1, 2027 or such later date as may be prescribed by the regulations |
| Overlay or local rule | Oak Ridges Moraine zones (ORM-AG, ORM-RR, ORM-ER) and Greenbelt Natural Heritage System restrict ADUs | scugog.caChecked 5 October 2026In the source's wordsOak Ridges Moraine Zones: Oak Ridges Moraine - Agricultural (ORM-AG) |
Heritage
| Item | What applies | Source |
|---|---|---|
| Heritage Conservation Districts | Downtown Port Perry | scugog.caChecked 5 October 2026 |
| Heritage | Downtown Port Perry Heritage Conservation District (Part V), By-law 91-10 | scugog.caChecked 5 October 2026In the source's wordsCouncil passed a by-law to Create the Downtown Port Perry Heritage Conservation District, By-law 91-10 |
Building activity
| Item | What applies | Source |
|---|---|---|
| New residential units (all types incl. ARUs), building permits issued, 2024 | 130 | media-003-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsPermits issued for new residential units (# of units) ... Scugog 130 ... 48 |
| New residential units (all types incl. ARUs), building permits issued, 2025 | 48 | media-003-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsPermits issued for new residential units (# of units) ... Scugog 130 ... 48 |
| Value of residential building permits ($ million), 2024 | 56.3 | media-003-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsTotal value of residential building permits ($ million) ... Scugog 56.3 ... 13.1 |
| Value of residential building permits ($ million), 2025 | 13.1 | media-003-ca.cdn.govstack.comChecked 5 October 2026In the source's wordsTotal value of residential building permits ($ million) ... Scugog 56.3 ... 13.1 |
Counts as the municipality or its open data report them. A partial year is marked; never compare it with a full year.

The nearest finished jobs

West Lynde
New second storey of about 800 sq ft with two bedrooms, a walk-in closet and a bathroom; new kitchen, two new bathrooms, floors, stairs and trim below.
Explore the home
Orra
Two load-bearing walls out, kitchen and living room swapped, gas fireplace with built-ins, new floors, doors and trim, popcorn ceilings removed.
Explore the home
Bellamy
Whole main floor: load-bearing walls out, steel beams in, new kitchen, mudroom, office, fireplace, floors, trim and doors.
Explore the home
Stone Ridge
Full basement finish: rec room, media wall, arched wet bar, bathroom, laundry room and bedroom.
Explore the home
Nearby towns
Sources
- Township of Scugog: Building permits scugog.ca
- Township of Scugog: Building and renovating scugog.ca
- Township of Scugog: Required building fees 2026 media-001-ca.cdn.govstack.com
- publications.gov.on.ca publications.gov.on.ca
- Township of Scugog: Scugog schedule of development charges july 1 2026 media-001-ca.cdn.govstack.com
- Township of Scugog: 16 24 being a by law to establish development charges for the media-001-ca.cdn.govstack.com
- ontario.ca ontario.ca
- Township of Scugog: Zoning scugog.ca
- Township of Scugog: 2025 scugog zbl 14 14 office consolidation working copy media-001-ca.cdn.govstack.com
- Township of Scugog: 17 24 planning fees jan 01 2026 final accessible media-001-ca.cdn.govstack.com
- Township of Scugog: Committee of adjustment scugog.ca
- Township of Scugog: Additional dwelling units scugog.ca
- ontario.ca ontario.ca
- LSRCA: Governance lsrca.on.ca
- CLOCA: About us cloca.com
- Kawartha Conservation: Apply for a permit kawarthaconservation.com
- ontario.ca ontario.ca
- Township of Scugog: Heritage conservation district scugog.ca
- Durham Region: 2026 info 54 2025 annual building activity review media-003-ca.cdn.govstack.com