Family owned since 2007Ajax · Durham Region · Greater Toronto Area4.9 on Google
What’s your next chapter?

Good homes start
with a conversation.

james@jarviscontracting.ca(289) 892-4169Home additions & renovations
Durham Region & the Greater Toronto Area

How we price a job

We don't price from a chart. James sees the house and gives you a rough estimate on the spot, then a detailed proposal: the whole project is priced, and the contract signed, before any design work begins. Our contracts are fixed price. If a design selection or finish changes the price, the change goes through a change order you sign. Our guide to fixed price and cost-plus explains the two ways contractors charge.

What the ranges leave out

Unless a row says otherwise, every range here is before 13% HST. Our drawing prices are the drawings alone: permit fees, HVAC engineering, truss design, a committee of adjustment application and anything unforeseen are extra. Whoever you ask, check what their number includes.

What Ontario law says about estimates

A renovation over $50 needs a written contract, and the final price can't exceed the estimate by more than 10% unless you agree to changes (ontario.ca).

Budgeting for your home

Home additions

WorkRangeBasisSource
Home addition, any type$350 to $600per sq ftGTA, 2026. Before 13% HST.Our 2026 price
Single-storey rear addition, 300 to 700 sq ft$180,000 to $450,000GTA, 2026. Before 13% HST.Our 2026 price
Bump-out, 100 to 300 sq ft$60,000 to $180,000GTA, 2026. Before 13% HST.Our 2026 price

What moves the number

  • The foundation: full basement, crawlspace or slab
  • How much of the existing house opens up to join the new space
  • The roof: new rafters meeting the old roof
  • Engineering, drawings and the permit
  • Finish level inside
  • 13% HST, which these ranges leave out

Budgeting for your home

Second-storey additions

WorkRangeBasisSource
Second-storey addition, 600 to 1,200 sq ft$300,000 to $800,000GTA, 2026. The new floor; a kitchen or bathrooms below add to it. Before 13% HST.Our 2026 price

What moves the number

  • Whether the foundation and walls can carry the new floor, or need reinforcing
  • A full storey or a partial one
  • Whether the main floor is redone at the same time
  • The roof design and how it meets what's left
  • Engineering, drawings and the permit
  • Finish level, and 13% HST on top

Budgeting for your home

Basement renovations

WorkRangeBasisSource
Full legal basement apartment$80,000 to $180,0002026. Before 13% HST.Our 2026 price
Basement bathroom$25,000 to $50,0002026; the top end when new plumbing goes under the slab. Before 13% HST.Our 2026 price
Basement finishing$55 to $90per sq ft2026, by finish level. Before 13% HST.Our 2026 price
Legalising an already-finished basement$45,000 to $95,0002026. Before 13% HST.Our 2026 price
Separate side-door entrance$18,000 to $28,0002026. Before 13% HST.Our 2026 price
Underpinning the full perimeter$60,000 to $120,0002026, when the ceiling is too low. Before 13% HST.Our 2026 price

What moves the number

  • Ceiling height, and whether the floor has to be lowered or underpinned
  • A second unit or not: fire separation, a second exit, a kitchen
  • A separate entrance or a walkout
  • Bathrooms and how far the plumbing runs
  • Moisture or water damage found when the walls open
  • Finish level, and 13% HST on top

Budgeting for your home

Whole-home renovations

No single range: every job is priced after a site visit.

What moves the number

  • How much of the house changes
  • Load-bearing walls, and the beams that replace them
  • What's behind the walls: asbestos, knob-and-tube wiring, water damage
  • Hiding pipes and ducts without bulkheads
  • Finish level, and 13% HST on top

Budgeting for your home

Kitchen renovations

WorkRangeBasisSource
Kitchen renovation, mid-range$40,000 to $75,0002026. Before 13% HST.Our 2026 price
Kitchen renovation, premium$85,000 to $150,0002026. Before 13% HST.Our 2026 price

What moves the number

  • Moving the sink, the range or a wall
  • Cabinets: stock, semi-custom or custom
  • Counters and stone
  • Appliances
  • Structural work when walls come out
  • 13% HST on top

Budgeting for your home

Bathroom renovations

WorkRangeBasisSource
Basement bathroom$25,000 to $50,0002026; the top end when new plumbing goes under the slab. Before 13% HST.Our 2026 price

What moves the number

  • Moving the toilet, shower or drain
  • Tile: size, pattern and how much of the room it covers
  • Vanity, glass and fixtures
  • Water damage under the old floor
  • 13% HST on top
WorkRangeBasisSource
Permit drawings for an addition$6,000 to $12,0002026. Drawings only: permit fees, HVAC engineering, truss design, committee of adjustment applications and anything unforeseen are extra. Before 13% HST.Our 2026 price
Permit drawings for a basement apartment$4,000 to $8,0002026. Drawings only: permit fees, HVAC engineering, truss design, committee of adjustment applications and anything unforeseen are extra. Before 13% HST.Our 2026 price
Permit drawings for a garden suite$5,000 to $15,0002026. Drawings only: permit fees, HVAC engineering, truss design, committee of adjustment applications and anything unforeseen are extra. Before 13% HST.Our 2026 price

What moves the number

  • Size and complexity
  • Structural engineering
  • A minor variance application
  • How many design revisions

Budgeting for your home

Design-build

No single range: every job is priced after a site visit.

What moves the number

  • The scope you choose
  • The finishes you pick with the designer
  • Structural work
  • 13% HST on top

Where there's no range

Whole-home renovations and design-build projects vary too much for one range, so we don't print one. They're priced after James sees the house. The service pages list what drives each one.

Sources

  1. ontario.ca ontario.ca