Family owned since 2007Ajax · Durham Region · Greater Toronto Area4.9 on Google
What’s your next chapter?

Good homes start
with a conversation.

james@jarviscontracting.ca(289) 892-4169Home additions & renovations
Durham Region & the Greater Toronto Area

We price a basement bathroom at $25,000 to $50,000 in 2026, before HST; the top end is when new plumbing has to go under the slab. Main-floor bathrooms and ensuites vary too much for one range, so yours is priced after a site visit. We've built ensuites with walk-in showers, a wet room under a skylight and a wheelchair-accessible basement bathroom.

What's included

A primary ensuite with a wood double vanity, brass taps, two oval brass mirrors and a gridded glass door into a skylit wet room

Every job, start to finish

  1. A layout and 3D model
  2. Waterproofing behind and under the tile
  3. Tile, vanity, glass and fixtures chosen with the designer
  4. Plumbing, venting and electrical
  5. Accessible layouts when you need them

The kinds of job

  • Ensuites and main bathrooms
  • Basement bathrooms
  • Powder rooms
  • Wet rooms and walk-in showers
  • Accessible bathrooms
Typical duration
Set after the first site visit
Permits involved
  • A building permit when a bathroom is added or drains move
  • Electrical work by a licensed electrical contractor, who files a notification with the Electrical Safety Authority

What it costs

Our 2026 ranges, not quotes. Every job is priced after a site visit, and the first estimate is free.

WorkRangeBasisSource
Basement bathroom$25,000 to $50,0002026; the top end when new plumbing goes under the slab. Before 13% HST.Our 2026 price

What moves the number

  • Moving the toilet, shower or drain
  • Tile: size, pattern and how much of the room it covers
  • Vanity, glass and fixtures
  • Water damage under the old floor
  • 13% HST on top

Bathroom renovations

Do I need a permit for a bathroom renovation?

Replacing fixtures where they are, usually not. Adding a bathroom or moving drains does need one, and your municipality's building department decides. Electrical work goes through a licensed electrician who notifies the Electrical Safety Authority (ESA).

How long does a bathroom take?

It depends on the room and on what's under the old floor. On Aurelia the owners added an upstairs bathroom halfway through the job, and it was designed, selected and built in a couple of weeks so they could move in with their newborn.

Real work

Greenwood: a primary ensuite and a wet room under a skylight on the new top floor, and a curved micro-cement vanity in the powder room. West Lynde: emerald tile with a gold edge over a hex floor. Stone Ridge: a basement bathroom with a checkerboard floor.

Where we do this

In Ajax, Aurora, Brampton, Burlington, Caledon, Clarington, East Gwillimbury, Halton Hills, King, Markham, Milton, Mississauga, Newmarket, Oakville, Oshawa, Pickering, Richmond Hill, Scarborough, Scugog, Toronto, Uxbridge, Vaughan, Whitby and Whitchurch-Stouffville.

How the job runs

  1. Meet James

    James meets you at the house, hears what you want and gives you a rough estimate on the spot. The first estimate is free.

  2. Proposal and contract

    If the estimate works for you, James prepares a detailed proposal. The whole project is priced, and the contract signed with a 10% deposit, before any design work begins.

  3. Design onboarding

    Our designer sends you an onboarding email with some homework: your style, how your family uses the house, and what you need and want. You share Pinterest boards, then go through them together on a Zoom call: what you like in the pictures, and what you don't.

  4. Measure and floor plans

    The designer measures the house and draws the floor plan: which walls come out, where the stairs land, how new space joins the old. We go through it with you until it's confirmed.

  5. Drawings and 3D rendering

    With the plan confirmed, she draws the elevations and the millwork, then puts it all into a 3D rendering, so you see the rooms before anyone orders a cabinet.

  6. Finishes presentation

    We don't take you round the stores: there are too many options. Using what she learned in onboarding, the designer narrows the tile, flooring, quartz, plumbing fixtures and the rest to a few choices that suit your style, collects the samples and presents them to you in our office. If a selection changes the price, the change goes through a change order you sign.

  7. Permits and engineering

    We prepare the permit drawings, bring in the structural engineer wherever a beam or a load changes, and apply to the municipality. If the plan changes after the permit is issued, we file the amendment.

  8. Construction

    Our crew and trades build it, with one point of contact from demolition to the last coat of paint. Our site supervisors write a job log every day, which you can follow in our online app. When we open a wall and find a problem, you hear about it, and what it costs, before we fix it.

  9. Inspections

    The municipal building inspector checks the work at each stage the permit sets, before it gets covered up.

  10. Handover

    We walk the finished house with you and put right anything that isn't. On one job a stair stain didn't match the new floor, so we refinished the stairs.

Credentials

Questions

How much does a bathroom renovation cost in Toronto?

We price a basement bathroom at $25,000 to $50,000 in 2026, before HST, with the top end when new plumbing goes under the slab. Main-floor bathrooms and ensuites are priced after a site visit: tile, fixtures and moving the drains decide most of the cost.

Do I need a permit to renovate a bathroom in Ontario?

A bathroom renovation in Ontario needs a building permit when it adds a bathroom or moves drains and plumbing; replacing fixtures in place usually doesn't. Your municipality's building department makes the call, and electrical work goes through a licensed electrician.

Can you build an accessible bathroom?

Yes. The family firm built a wheelchair-accessible bathroom in a client's basement in 2017, and an accessible layout is drawn and modelled in 3D like any other bathroom before work starts.

How long does a bathroom renovation take?

A bathroom renovation's length depends on the room and on what's found under the old floor. On our Aurelia job the owners added an upstairs bathroom halfway through, and we designed, selected and built it in a couple of weeks.