Family owned since 2007Ajax · Durham Region · Greater Toronto Area4.9 on Google
What’s your next chapter?

Good homes start
with a conversation.

james@jarviscontracting.ca(289) 892-4169Home additions & renovations
Durham Region & the Greater Toronto Area
Municipality
City of Oshawa
Facts checked
6 October 2026

Includes Eastdale, Kedron, Pinecrest, Taunton, Windfields and Samac.

Confirm with the building department before you apply.

More about building in Oshawa

Architectural design and permit drawings in Oshawa

The Oshawa rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the architectural design and permit drawings page.

Design-build in Oshawa

The Oshawa rules that apply are in the tables below. What it costs, how the job runs and our finished jobs are on the design-build page.

Permits and rules in Oshawa

Every line links to the page it came from, with the date it was checked.

Applying for a permit in Oshawa

Applying for a permit in Oshawa, Oshawa
ItemWhat appliesSource
Where to applyOshawa Application Portal (servicecv.oshawa.ca)oshawa.caChecked 5 October 2026
In the source's words
You can now apply for building permits, check the status of applications and pay fees through our Application Portal.
Phone905-436-3311oshawa.caChecked 5 October 2026
In the source's words
Call 905-436-3311 and ask for your Building Inspector by name or enter their extension number.
Emailservice@oshawa.caoshawa.caChecked 5 October 2026
In the source's words
Email: service@oshawa.ca
Fee by-lawBuilding By-law 33-2009, Schedule B, as amended by 8-2016, 149-2024, 98-2024 and 118-2025; fees effective January 1, 2026media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Schedule ‘B’ to By-law 33-2009 Part “A” Fees Payable for Permits (Effective January 1, 2026)
Local service levelCity warns it cannot guarantee OBC review timeframes due to record application volumeoshawa.caChecked 5 October 2026
In the source's words
due to record breaking volume of applications, we cannot guarantee review timeframes will be met.
Permit decision time (Ontario)10 days for a house where no dwelling unit is located above another dwelling unit (except retirement homes), and for a detached structure serving it up to 55 m² building areapublications.gov.on.caChecked 5 October 2026
In the source's words
a house where no dwelling unit is located above another dwelling unit.

Building permit fees

Building permit fees, Oshawa
ItemWhat appliesSource
New house permit fee$15.56 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
House, Accessory building for human habitation $15.56 / sq. m.
Addition permit fee$15.56 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
House, Accessory building for human habitation $15.56 / sq. m.
Interior alteration permit fee$7.79 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
House, Finishing Basement (Existing or New House) $7.79 / sq. m.
Basement finish permit fee$7.79 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
House, Finishing Basement (Existing or New House) $7.79 / sq. m.
Additional residential unit permit fee$15.56 per m² (a garden suite, item 23 'accessory building for human habitation'; no separate line for a unit inside the house)media-002-ca.cdn.govstack.comChecked 6 October 2026
In the source's words
House, Accessory building for human habitation $15.56 / sq. m.
Accessory building permit fee$4.83 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Accessory Structure - Residential (e.g., detached garage, carport, shed, etc.) $4.83 / sq. m.
Deck$160 flatmedia-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Deck, Porch, Ramp, Balcony per storey, Walk-up Stair $160 flat fee each
Minimum permit fee$160 flatmedia-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
A minimum fee of $160 shall be charged unless the fee is a larger amount.
Plumbing, per fixture$27 per fixturemedia-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
House $27 flat fee / fixture
Work not listed in the schedule1.12% of estimated construction valuemedia-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
The permit fee for construction not provided for in this Schedule shall be calculated at 1.12% of estimated construction value.
Window or door replacement$9.65 per m of widthmedia-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Window or Door Replacement $9.65 / metre of window/door width
Work started without a permitSurcharge 25% (application received) or 50% (no application) of permit fee for building without a permitmedia-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Surcharge of 50% of permit fee when construction has begun and no permit application has been received.
Demolition$32.11 per 100 m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
$32.11 for each 100 square metres of floor area or part thereof

Fees as the municipality's 2026 schedule prints them. A rate with no single number shows the rule instead.

Development charges on a new house

Development charges on a new house, Oshawa
ItemWhat appliesSource
Oshawa (municipal)$40,720oshawa.caChecked 5 October 2026
In the source's words
City of Oshawa $40,720
Durham Region (regional)$76,227media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Total of All Charges $76,227
School boards (education)$7,535oshawa.caChecked 5 October 2026
In the source's words
Public School $4,349 ... Separate School $3,186
Total, as published$130,682 (includes $6,200 parkland cash-in-lieu)oshawa.caChecked 5 October 2026
In the source's words
TOTAL for each unit $130,682
NoteResidential DCs may be deferred to occupancyoshawa.caChecked 5 October 2026
In the source's words
Residential Development Charges may be deferred to occupancy.
Note (2)Downtown Oshawa Urban Growth Centre core area exempt from City DCsoshawa.caChecked 5 October 2026
In the source's words
Lands wholly within that part of Oshawa partially known as the Core Area of the Downtown Oshawa Urban Growth
Additions to an existing house (Ontario)Enlarging an existing residential unit (e.g., an addition) does not trigger development chargesontario.caChecked 5 October 2026
In the source's words
does not satisfy the requirements of subsection (2) if the only effect of the action is to permit the enlargement of an existing residential unit
When charges are paid (Ontario)Since Nov 3, 2025, DCs on residential development (other than rental) are paid in full at the earlier of occupancy permit issuance or first occupancy, instead of at building permitontario.caChecked 5 October 2026
In the source's words
shall be paid in full on the earlier of, (a) the day a permit is issued under the Building Code Act, 1992 authorizing occupation of the building; and (b) the day the building is first occupied.

Per single or semi-detached house, rates as of 2026-07-01.

Zoning and minor variances

Zoning and minor variances, Oshawa
ItemWhat appliesSource
Zoning by-lawZoning By-law 60-94 (as amended; consolidation updated 12/01/2025)oshawa.caChecked 5 October 2026
In the source's words
Zoning By-law 60-94, as amended, is the City's current zoning by-law.
Lot coverage (typical residential zone)40% in R1-A to R1-E zones (45% if the lot has one or more accessory apartments)media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Maximum Lot Coverage (%)1 40 40 40 40 40 20 10 20
Height (typical residential zone)9.0 m in R1-A to R1-E zones (10.5 m in R1-F to R1-H)media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Maximum Height (m) 9.0 9.0 9.0 9.0 9.0 10.5 10.5 10.5
Minor variance (Committee of Adjustment) fee$856 per lotoshawa.caChecked 5 October 2026
In the source's words
$856
Committee of AdjustmentApplications, schedule and decisionsoshawa.caChecked 5 October 2026

Additional units: basement apartments, garden suites, coach houses

Additional units: basement apartments, garden suites, coach houses, Oshawa
ItemWhat appliesSource
Homes allowed on one lot3, the house includedoshawa.caChecked 5 October 2026
In the source's words
You are permitted a maximum of 3 residential dwelling units on your lot, of which, a maximum of 1 accessory unit may be in an accessory building on the property.
Detached unit sizethe most restrictive of: any one accessory building 8% of the lot or 75% of the house's coverage; all of them together 10% of the lot, 100% of the house's coverage or 60 m²media-002-ca.cdn.govstack.comChecked 6 October 2026
In the source's words
Ten percent (10%) of the lot area; however, in no case shall any individual accessory building exceed a lot coverage of eight percent (8%);
RuleAccessory apartments permitted in single, semi, duplex and street townhouse dwellings or a residential accessory building in R1, R2, R3, R5, OSR-A, OS-ORM, AG-A, AG-B and AG-ORM zones; max 3 units per lot, max 1 in an accessory buildingoshawa.caChecked 5 October 2026
In the source's words
You are permitted a maximum of 3 residential dwelling units on your lot, of which, a maximum of 1 accessory unit may be in an accessory building on the property.
Rule (2)Garden suite (accessory building) limits, Zoning By-law 60-94 as amended by By-law 59-2026: in R1-A to R1-F, R2, R3 and R5 zones all accessory buildings together max 10% of the lot (any one 8%), 100% of the house's lot coverage (any one 75%) and 60 m² of ground floor area, whichever is most restrictive (R1-G and R1-H: 8%, 100%, 90 m²); height the lesser of 4.5 m or the house's height, up to 6.0 m if set back 6.0 m from the rear lot line (R1-G and R1-H: 5.0 m, same 6.0 m rule); 0.6 m from interior side and rear lot lines; 3.0 m from the housemedia-002-ca.cdn.govstack.comChecked 6 October 2026
In the source's words
Ten percent (10%) of the lot area; however, in no case shall any individual accessory building exceed a lot coverage of eight percent (8%);
Rule (3)A garden suite (accessory building with an accessory apartment) must be 30 m from a railway right-of-way, 14 m from the Highway 401 or 407 East property line and 7.0 m from the outer limit of any gas or oil pipeline corridormedia-002-ca.cdn.govstack.comChecked 6 October 2026
In the source's words
An accessory building containing an accessory apartment shall be setback a minimum of 7.0m from the outer limit of any gas or oil pipeline corridor.
Rule (4)Parking: one extra space per accessory unit (3 spaces for 2 units, 4 for 3 units; 2.75 m x 5.75 m; limited tandem); 50% of front yard kept as landscaped open space; 0.81 m hard-surface path to streetoshawa.caChecked 5 October 2026
In the source's words
One (1) additional parking space is required for each accessory dwelling
Rule (5)Two-unit house registration certificate issued through the permit process; pre-July 1994 units legalized through Municipal Licensingoshawa.caChecked 5 October 2026
In the source's words
When you construct an accessory apartment through the building permit process, you will receive a two-unit house registration.
Three units as of right (Ontario)On a parcel of urban residential land, municipalities cannot prohibit: 2 units in a detached/semi/rowhouse plus 1 unit in an ancillary building, OR 3 units in the house with none in an ancillary buildingontario.caChecked 5 October 2026
In the source's words
three residential units in a detached house, semi-detached house or rowhouse on a parcel of urban residential land, if no building or structure ancillary to the detached house, semi-detached house or rowhouse contains any residential units

Conservation authority and environmental rules

Conservation authority and environmental rules, Oshawa
ItemWhat appliesSource
Conservation authorityCentral Lake Ontario Conservation Authority (CLOCA)oshawa.caChecked 5 October 2026
In the source's words
contact the Central Lake Ontario Conservation Authority (C.L.O.C.A.)
When its permit is neededCLOCA permit for construction in a fill-regulated area or floodplain or that may interfere with a watercourseoshawa.caChecked 5 October 2026
In the source's words
Where construction is in a fill regulated area or flood plain or may interfere with a watercourse
Its permit feesMinor Permit B $535 for pools, sheds, decks, minor additionscloca.comChecked 5 October 2026
In the source's words
Minor Permit B $535
From 2027-02-01: Central Lake Ontario Conservation Authority (CLOCA)Becomes part of the Central Lake Ontario Regional Conservation Authority (Conservation Authorities Act, Bill 97)ontario.caChecked 5 October 2026
In the source's words
“transition date” means February 1, 2027 or such later date as may be prescribed by the regulations
Overlay or local ruleConstruction near the Oshawa Executive Airport needs airport clearance before permit issuanceoshawa.caChecked 5 October 2026
In the source's words
You will need clearance from the Oshawa Executive Airport before a building permit is issued.
Overlay or local rule (2)Oak Ridges Moraine zones (OS-ORM, AG-ORM) in north Oshawaoshawa.caChecked 5 October 2026
In the source's words
located in a R1, R2, R3, R5, OSR-A, OS-ORM, AG-A, AG-B or AG-ORM Zone

Heritage

Heritage, Oshawa
ItemWhat appliesSource
Heritage Conservation DistrictsSouth Fieldmedia-002-ca.cdn.govstack.comChecked 5 October 2026
HeritageOver 40 properties designated under the Ontario Heritage Actoshawa.caChecked 5 October 2026
In the source's words
Over 40 properties also have Ontario Heritage Act designation for their cultural heritage value or interest.
Heritage (2)South Field Heritage Conservation District (1000 Stevenson Road North), Oshawa's first HCD, designated 2021media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
City of Oshawa's first Heritage Conservation District, designated in 2021.

Building activity

Building activity, Oshawa
ItemWhat appliesSource
Two-unit house registration certificates issued, 2023246arcgis.comChecked 5 October 2026
In the source's words
Date Certificate was Issued
Two-unit house registration certificates issued, 2024338arcgis.comChecked 5 October 2026
In the source's words
Date Certificate was Issued
Two-unit house registration certificates issued (Jan 1 to Nov 26 only), 2025251arcgis.comChecked 5 October 2026
In the source's words
Date Certificate was Issued
New residential units in building permits issued (all types incl. ARUs), 2024934media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Oshawa 934 25.9 519 10.5 -44.4
New residential units in building permits issued (all types incl. ARUs), 2025519media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Oshawa 934 25.9 519 10.5 -44.4
Value of residential building permits ($ million), 2024286.3media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Oshawa 286.3 ... 141.7
Value of residential building permits ($ million), 2025141.7media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Oshawa 286.3 ... 141.7
Average cost of a new single detached dwelling (CMHC, via Durham Region), 20241,193,449media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Oshawa $1,193,449 $1,400,851
Average cost of a new single detached dwelling (CMHC, via Durham Region), 20251,400,851media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Oshawa $1,193,449 $1,400,851
Open datahttps://city-oshawa.opendata.arcgis.com/city-oshawa.opendata.arcgis.comChecked 5 October 2026
In the source's words
City of Oshawa Open Data
Permit datasetOshawa Registered Two Unit Apartments (CSV)arcgis.comChecked 5 October 2026
In the source's words
A list of Registered Two Unit Apartments that have been issued a certificate along with the date of issue.

Counts as the municipality or its open data report them. A partial year is marked; never compare it with a full year.

An open kitchen with a sage-green island and hood, white shaker cabinets, black stools and an oak and black-spindle stair rail to the right
West Lynde / From our portfolioInside the home