
Our expertise
Basement renovations
Finished basements and legal second units, built to the code the inspector checks.
We price basement finishing at about $55 to $90 per square foot in 2026, and a full legal basement apartment at $80,000 to $180,000, before HST. A legal unit has to meet the Ontario Building Code's rules for secondary suites, such as a 1.95 m ceiling and a fire separation between the units, and pass your town's inspections.
What's included

Every job, start to finish
- A check of ceiling height, exits and windows before design
- Floor plans and finishes with our designer
- Permit drawings, and the application for a second unit
- Fire separation and sound between units
- Egress windows and separate entrances
- Bathrooms, wet bars and laundry
The kinds of job
- Basement finishing: rec rooms, bedrooms, bathrooms, bars and laundry
- Legal second units
- Separate entrances and walkouts
- Opening up a basement by moving walls
- Typical duration
- Set after the first site visit
- Permits involved
- A building permit for a second unit, and for plumbing or structural work
- The Building Code's secondary-suite rules: ceiling heights and a fire separation between units
- Registration of the unit where the town requires it, such as Whitby
- No development charges for a second or third unit in an existing house
- Electrical work by a licensed electrical contractor, who files a notification with the Electrical Safety Authority
What it costs
Our 2026 ranges, not quotes. Every job is priced after a site visit, and the first estimate is free.
| Work | Range | Basis | Source |
|---|---|---|---|
| Full legal basement apartment | $80,000 to $180,000 | 2026. Before 13% HST. | Our 2026 price |
| Basement bathroom | $25,000 to $50,000 | 2026; the top end when new plumbing goes under the slab. Before 13% HST. | Our 2026 price |
| Basement finishing | $55 to $90per sq ft | 2026, by finish level. Before 13% HST. | Our 2026 price |
| Legalising an already-finished basement | $45,000 to $95,000 | 2026. Before 13% HST. | Our 2026 price |
| Separate side-door entrance | $18,000 to $28,000 | 2026. Before 13% HST. | Our 2026 price |
| Underpinning the full perimeter | $60,000 to $120,000 | 2026, when the ceiling is too low. Before 13% HST. | Our 2026 price |
What moves the number
- Ceiling height, and whether the floor has to be lowered or underpinned
- A second unit or not: fire separation, a second exit, a kitchen
- A separate entrance or a walkout
- Bathrooms and how far the plumbing runs
- Moisture or water damage found when the walls open
- Finish level, and 13% HST on top
Finished jobs

Stone Ridge
Full basement finish: rec room, media wall, arched wet bar, bathroom, laundry room and bedroom.
Explore the home
Forest Ridge
A finished lower level with a bar, fireplace wall and built-in shelving.
Explore the home
Greenwood
Top floor replaced with a new storey, rear extension, basement enlarged, full interior design and build.
Explore the home
Solace
Complete gut to the studs, load-bearing walls removed and reframed, spray foam throughout, new upstairs washroom, full interior design.
Explore the home
Syncopa
Permits, steel beams, layout reworked, stone fireplace out, three new bathrooms, new doors, floors, trim and tile, attic insulation upgraded.
Explore the home
Bellamy
Whole main floor: load-bearing walls out, steel beams in, new kitchen, mudroom, office, fireplace, floors, trim and doors.
Explore the home
Basement renovations
Is it legal, or just finished?
A finished basement is a renovation. A legal second unit is a permitted, inspected apartment that meets the Building Code's secondary-suite rules: ceilings at least 1.95 m, 1.85 m under beams and ducts, and a fire separation between the units, which can be a continuous smoke-tight layer of 15.9 mm Type X drywall (2024 Building Code Compendium). Turning one unit into two needs a permit even if you build nothing (Building Code Act). Our legal basement requirements guide lists the rest.
What does a legal basement apartment cost?
A full legal basement apartment runs $80,000 to $180,000 with us in 2026, and legalising a basement that's already finished about $45,000 to $95,000, before HST. A separate side entrance is about $18,000 to $28,000 on its own, and a bathroom $25,000 to $50,000, more when new plumbing goes under the slab. Our legal basement cost guide breaks it down.
Does a basement apartment pay development charges?
No. A second or third unit inside an existing house is exempt from development charges (Development Charges Act). Some towns ask you to register it: Whitby charges $268 (Town of Whitby).
Do I need a permit to finish my basement?
Your town's building department decides, and the answer turns on what you're building: a second unit always needs one, and so does plumbing or structural work. Our basement permit guide covers each Durham town.
Real work
Stone Ridge, in Scarborough, is a finished basement with a rec room and panelled media wall, an arched wet bar, a bathroom, a laundry and a bedroom. One client, whose basement had been a storeroom for twenty years, wrote that the job "doubled the size of the living area in our home" (Tony O'Brien, Google review).
Where we do this
In Ajax, Aurora, Brampton, Brock, Burlington, Caledon, Clarington, East Gwillimbury, Georgina, Halton Hills, King, Markham, Milton, Mississauga, Newmarket, Oakville, Oshawa, Pickering, Richmond Hill, Scarborough, Scugog, Toronto, Uxbridge, Vaughan, Whitby and Whitchurch-Stouffville.
How the job runs
Meet James
James meets you at the house, hears what you want and gives you a rough estimate on the spot. The first estimate is free.
Proposal and contract
If the estimate works for you, James prepares a detailed proposal. The whole project is priced, and the contract signed with a 10% deposit, before any design work begins.
Design onboarding
Our designer sends you an onboarding email with some homework: your style, how your family uses the house, and what you need and want. You share Pinterest boards, then go through them together on a Zoom call: what you like in the pictures, and what you don't.
Measure and floor plans
The designer measures the house and draws the floor plan: which walls come out, where the stairs land, how new space joins the old. We go through it with you until it's confirmed.
Drawings and 3D rendering
With the plan confirmed, she draws the elevations and the millwork, then puts it all into a 3D rendering, so you see the rooms before anyone orders a cabinet.
Finishes presentation
We don't take you round the stores: there are too many options. Using what she learned in onboarding, the designer narrows the tile, flooring, quartz, plumbing fixtures and the rest to a few choices that suit your style, collects the samples and presents them to you in our office. If a selection changes the price, the change goes through a change order you sign.
Permits and engineering
We prepare the permit drawings, bring in the structural engineer wherever a beam or a load changes, and apply to the municipality. If the plan changes after the permit is issued, we file the amendment.
Construction
Our crew and trades build it, with one point of contact from demolition to the last coat of paint. Our site supervisors write a job log every day, which you can follow in our online app. When we open a wall and find a problem, you hear about it, and what it costs, before we fix it.
Inspections
The municipal building inspector checks the work at each stage the permit sets, before it gets covered up.
Handover
We walk the finished house with you and put right anything that isn't. On one job a stair stain didn't match the new floor, so we refinished the stairs.
Credentials
- Written warranty1 year workmanship and materials, 2 years plumbing, heating, electrical and building envelope, 7 years structural
- BBB Accredited BusinessAccredited by the Better Business Bureau since November 2025
- Durham Region Home Builders' AssociationMember, Renovators
- RenoMarkRenoMark renovator, through the DRHBA
Questions
What makes a basement apartment legal in Ontario?
What ceiling height does a basement apartment need in Ontario?
How much does a legal basement apartment cost in Ontario?
Do I pay development charges on a basement apartment?
Guides
- Do you need a permit to finish a basement in Durham Region?
- HCRA licence and Tarion warranty: who needs them in Ontario
- How many units can I add to my lot in Ontario?
- Questions to ask a contractor in Ontario before you sign
- What does a legal basement apartment cost in Ontario in 2026?
- What does a legal basement apartment need in Ontario?
- Whitby's ADU incentive: fees refunded for applications by 31 Dec 2026
Sources
- 2024 Building Code Compendium publications.gov.on.ca
- Building Code Act ontario.ca
- Development Charges Act ontario.ca
- Town of Whitby whitby.ca