Family owned since 2007Ajax · Durham Region · Greater Toronto Area4.9 on Google
What’s your next chapter?

Good homes start
with a conversation.

james@jarviscontracting.ca(289) 892-4169Home additions & renovations
Durham Region & the Greater Toronto Area

We price a mid-range kitchen renovation at about $40,000 to $75,000 before HST in 2026, and a premium one at $85,000 to $150,000. Ours start with our designer at Juliette Interiors: a floor plan, then a 3D model with the finishes in it, then a finishes presentation in our office, so you choose cabinets after you've seen them in the room. We don't have a showroom; we can show you past projects in person.

We're based in Ajax and renovate kitchens there and across Durham Region and the Greater Toronto Area. In Ajax, on our Orra job, we took out two load-bearing walls so the kitchen and the living room could swap places.

What's included

A bar wall with a white and grey-veined marble backsplash and shelf, two brass swing-arm lights, and tall cabinets with reeded black glass

Every job, start to finish

  1. A layout and a 3D model of the finished kitchen
  2. Cabinets, counters, backsplash and hardware chosen with the designer
  3. Walls opened with engineered beams where needed
  4. Plumbing, electrical and lighting
  5. Flooring carried through to the rest of the floor

The kinds of job

  • Full kitchen renovations
  • Opening a kitchen to the living space
  • Moving the kitchen to another part of the house
  • Custom details: curved hoods, islands, built-ins
Typical duration
Set after the first site visit
Permits involved
  • A building permit when walls, plumbing or structure change
  • Electrical work by a licensed electrical contractor, who files a notification with the Electrical Safety Authority
  • Gas lines and appliances by a TSSA-certified gas fitter

What it costs

Our 2026 ranges, not quotes. Every job is priced after a site visit, and the first estimate is free.

WorkRangeBasisSource
Kitchen renovation, mid-range$40,000 to $75,0002026. Before 13% HST.Our 2026 price
Kitchen renovation, premium$85,000 to $150,0002026. Before 13% HST.Our 2026 price

What moves the number

  • Moving the sink, the range or a wall
  • Cabinets: stock, semi-custom or custom
  • Counters and stone
  • Appliances
  • Structural work when walls come out
  • 13% HST on top

What our kitchen clients say

Rated 4.9 from 28 reviews on Google (as of October 5, 2026). Read every review.
  • James and his team did a wonderful job on our kitchen!

    Kumuthavathani KulathilaganGoogle, about 2 years before October 2026
  • always gave us options to help us remain on budget where possible

    Leila WongGoogle, about 1 year before October 2026
  • relocation of the kitchen and fireplace

    Lindsay AllenGoogle, about 1 year before October 2026

Get a price for your project

James comes to the house first and prices the whole job before design starts. The first estimate is free.

Book the site visitCall (289) 892-4169

Kitchen renovations

What does a kitchen renovation cost in 2026?

About $40,000 to $75,000 for a mid-range kitchen with us, and $85,000 to $150,000 for a premium one, before HST. Moving walls or plumbing, custom cabinets and stone counters push a kitchen up the range. Whoever you ask, check what the quote includes: walls, flooring, lighting, appliances and HST.

Do I need a permit to renovate a kitchen?

New cabinets and counters alone, usually not; moving walls, plumbing or structure, yes. Your municipality's building department decides. Electrical work goes through a licensed electrician and the Electrical Safety Authority (ESA), and a gas range through a TSSA-certified fitter.

Do you renovate kitchens in Ajax?

Yes. Our office is in Ajax, at 15 Harwood Ave S, and Ajax is home ground: at Orra, a brick house in Ajax, two load-bearing walls came out so the kitchen and the living room could swap places, with the ducts and pipes hidden and no bulkheads. We also work across Pickering, Whitby, Oshawa and the rest of Durham Region.

Real work

West Lynde: a quartz waterfall island and a painted island and hood. Bellamy: pale oak, a curved hood that matches the curve of the farmhouse sink, and a backlit shelf with a brass rail to stop cups sliding off. Aurelia: a black leather-finish porcelain island and reeded glass. Greenwood: a curved walnut island on a herringbone floor.

Where we do this

Each town's page carries its permit facts and the nearest finished jobs.

Also in Aurora, Brampton, Burlington, Caledon, East Gwillimbury, Halton Hills, King, Markham, Milton, Mississauga, Newmarket, Oakville, Richmond Hill, Scarborough, Toronto, Vaughan and Whitchurch-Stouffville.

How the job runs

  1. Meet James

    James meets you at the house, hears what you want and gives you a rough estimate on the spot. The first estimate is free.

  2. Proposal and contract

    If the estimate works for you, James prepares a detailed proposal. The whole project is priced, and the contract signed with a 10% deposit, before any design work begins.

  3. Design onboarding

    Our designer sends you an onboarding email with some homework: your style, how your family uses the house, and what you need and want. You share Pinterest boards, then go through them together on a Zoom call: what you like in the pictures, and what you don't.

  4. Measure and floor plans

    The designer measures the house and draws the floor plan: which walls come out, where the stairs land, how new space joins the old. We go through it with you until it's confirmed.

  5. Drawings and 3D rendering

    With the plan confirmed, she draws the elevations and the millwork, then puts it all into a 3D rendering, so you see the rooms before anyone orders a cabinet.

  6. Finishes presentation

    We don't take you round the stores: there are too many options. Using what she learned in onboarding, the designer narrows the tile, flooring, quartz, plumbing fixtures and the rest to a few choices that suit your style, collects the samples and presents them to you in our office. If a selection changes the price, the change goes through a change order you sign.

  7. Permits and engineering

    We prepare the permit drawings, bring in the structural engineer wherever a beam or a load changes, and apply to the municipality. If the plan changes after the permit is issued, we file the amendment.

  8. Construction

    Our crew and trades build it, with one point of contact from demolition to the last coat of paint. Our site supervisors write a job log every day, which you can follow in our online app. When we open a wall and find a problem, you hear about it, and what it costs, before we fix it.

  9. Inspections

    The municipal building inspector checks the work at each stage the permit sets, before it gets covered up.

  10. Handover

    We walk the finished house with you and put right anything that isn't. On one job a stair stain didn't match the new floor, so we refinished the stairs.

Credentials

Questions

How much does a kitchen renovation cost in Toronto?

We price a mid-range kitchen at about $40,000 to $75,000 and a premium one at $85,000 to $150,000 in 2026, before 13% HST. Moving walls or plumbing, custom cabinets and stone counters push a kitchen up the range.

Do I need a permit to renovate my kitchen in Ontario?

A kitchen renovation needs a building permit in Ontario when it moves walls, plumbing or structure; your municipality's building department decides. New electrical work must be done by a licensed electrical contractor who notifies the Electrical Safety Authority.

Can you move my kitchen to another part of the house?

Yes, with the plumbing, venting and any walls planned in the drawings first. On one main floor we relocated the kitchen and the fireplace and took out structural walls, and at Orra we swapped the kitchen and the living room.

Who designs the kitchen?

Our designer at Juliette Interiors draws the layout, builds the 3D model and presents the finishes to you in our office, with the samples in front of you. James's crew builds what she draws, so the design and the build are priced and planned together.