Does a home addition pay development charges anywhere in Durham Region?

No. An addition that enlarges your house without creating a new home pays no development charges in any Durham Region town, under the Development Charges Act, Durham's By-law 42-2023 and the Durham District School Board's by-law, as of October 2026. A new house pays $76,227 to the Region alone. An addition pays the town's permit fee instead, such as $22.37 per m² in Whitby or $15.56 per m² in Oshawa.

Checked 5 October 2026. Sources are listed at the end of the page.

Key takeaways

Permits in Durham Region

What applies to home additions here, with the municipal source for each line.

Permit facts for home additions in Durham Region
ItemWhat appliesSource
Ajax: addition permit fee$14.22 times the floor area; the Ajax schedule doesn't say whether the area is measured in m² or sq ftajax.caChecked 5 October 2026
In the source's words
Section A: CONSTRUCTION of new buildings, additions to existing buildings, including mezzanines
Brock: addition permit fee$19.90 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
New or Additions - SFD, Semi Link, Towns $19.90
Clarington: addition permit fee$17.73 per m²weblink.clarington.netChecked 5 October 2026
In the source's words
Single Family Dwellings, Semis, Townhouses, Duplexes, Live/Work Units $17.73 per sq.m
Oshawa: addition permit fee$15.56 per m²media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
House, Accessory building for human habitation $15.56 / sq. m.
Pickering: addition permit feeNo separate addition line in the July 2026 fees; the Chief Building Official sets the building category and floor area (Building By-law 8057/23 s.15(3)). Residential buildings are $20.12 per m² of gross floor areacorporate.pickering.caChecked 6 October 2026
In the source's words
the Chief Building Official, or a person designated by the Chief Building Official, shall determine the appropriate building category, floor area and/or value, and that determination shall be final.
Scugog: addition permit fee$20.43 per m²media-001-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
New Construction and Additions (for each m2 of GFA or part thereof) ... Other Residential Buildings $20.43
Whitby: addition permit fee$22.37 per m²media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Residential (SFD, Semi, Townhouse, Link, Duplex & Live/Work) - New / Additions Per m2 No $22.37
Ajax: conservation authority (1)Toronto and Region Conservation Authority (TRCA)ajax.caChecked 5 October 2026
In the source's words
Your property might be in a regulated area; please reach out to Town Planning staff, the Toronto and Region Conservation Authority (TRCA), or the Central Lake Ontario Conservation Authority
Ajax: conservation authority (2)Central Lake Ontario Conservation Authority (CLOCA)cloca.comChecked 5 October 2026
In the source's words
Sheet 1 - Lakeshore Ajax - Halls Road South, Whitby
Brock: conservation authority (1)Lake Simcoe Region Conservation Authority (LSRCA)lsrca.on.caChecked 5 October 2026
In the source's words
Township of Brock - Memorandum of Understanding
Brock: conservation authority (2)Kawartha Conservationkawarthaconservation.comChecked 5 October 2026
In the source's words
Our municipal partners include: City of Kawartha Lakes, Township of Scugog, Township of Brock
Clarington: conservation authority (1)Central Lake Ontario Conservation Authority (CLOCA)cloca.comChecked 5 October 2026
In the source's words
Our municipal partners include the Region of Durham, Cities of Oshawa and Pickering, Towns of Ajax and Whitby, Municipality of Clarington and Townships of Scugog and Uxbridge.
Clarington: conservation authority (2)Ganaraska Region Conservation Authority (GRCA)grca.on.caChecked 5 October 2026
In the source's words
from Wilmot Creek in Clarington to east of Cobourg ... This area includes seven municipalities in whole or in part ... Municipality of Clarington
Clarington: conservation authority (3)Kawartha Conservationkawarthaconservation.comChecked 5 October 2026
In the source's words
Our municipal partners include: City of Kawartha Lakes, Township of Scugog, Township of Brock, Municipality of Clarington
Oshawa: conservation authorityCentral Lake Ontario Conservation Authority (CLOCA)oshawa.caChecked 5 October 2026
In the source's words
contact the Central Lake Ontario Conservation Authority (C.L.O.C.A.)
Pickering: conservation authority (1)Toronto and Region Conservation Authority (TRCA)pickering.caChecked 5 October 2026
In the source's words
Toronto Region Conservation Authority
Pickering: conservation authority (2)Central Lake Ontario Conservation Authority (CLOCA)pickering.caChecked 5 October 2026
In the source's words
Central Lakes Ontario Conservation Authority
Scugog: conservation authority (1)Kawartha Conservation (most of Scugog)scugog.caChecked 5 October 2026
In the source's words
The Township of Scugog has three (3) Conservation Authorities, being Kawartha Conservation, Lake Simcoe Region Conservation Authority, and Central Lake Ontario Conservation Authority.
Scugog: conservation authority (2)Lake Simcoe Region Conservation Authority (LSRCA)lsrca.on.caChecked 5 October 2026
In the source's words
Councillor Durham Region (Scugog)
Scugog: conservation authority (3)Central Lake Ontario Conservation Authority (CLOCA)cloca.comChecked 5 October 2026
In the source's words
Our municipal partners include ... Municipality of Clarington and Townships of Scugog and Uxbridge.
Whitby: conservation authorityCentral Lake Ontario Conservation Authority (CLOCA)whitby.caChecked 5 October 2026
In the source's words
Central Lake Ontario Conservation Authority
Durham Region development charges, regional (as of 2026-07-01)$76,227media-003-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Total of All Charges $76,227
Durham Region development charges, education (as of 2026-07-01)$7,535media-002-ca.cdn.govstack.comChecked 5 October 2026
In the source's words
Residential (per dwelling unit) $4,349 $3,186 $7,535

Fees and rules as published by each municipality in Durham Region and the agencies linked, checked 6 October 2026. Confirm with the building department before you apply.

What it costs

Ranges with their sources, not quotes.

WorkRangeBasisSource
Home addition, any type$350 to $600per sq ftGTA, 2026. Before 13% HST.Our 2026 price
Single-storey rear addition, 300 to 700 sq ft$180,000 to $450,000GTA, 2026. Before 13% HST.Our 2026 price
Bump-out, 100 to 300 sq ft$60,000 to $180,000GTA, 2026. Before 13% HST.Our 2026 price

Our 2026 ranges, not quotes: every job is priced after a site visit.

What moves the number

  • The foundation: full basement, crawlspace or slab
  • How much of the existing house opens up to join the new space
  • The roof: new rafters meeting the old roof
  • Engineering, drawings and the permit
  • Finish level inside
  • 13% HST, which these ranges leave out

Building in Durham Region

How do Durham Region's towns compare for an addition?

Three exemptions line up for an addition. The Act's section 2(3), section 2.12(b) of Durham's By-law 42-2023 and section 10(2)(i) of the public school board's by-law all leave the enlargement of an existing home alone. So the costs that differ are local. As of October 2026:

TownAddition permit feeFee on a 40 m² addition (our arithmetic)Max lot coverage, common detached zoneResidential minor variance
Whitby$22.37 per m²$894.8020% (R1 to R3, By-law 1784; newer zones differ)$1,526
Scugog$20.43 per m²$817.2045% (urban residential)$2,760
Brock$19.90 per m²$796.0040% (R1 to R3)$1,530 (year not stated)
Clarington$17.73 per m² (Group C rate; confirm with the Building Division)$709.2040% (R1); 25% to 35% in Bowmanville's overlay$2,280
Oshawa$15.56 per m²$622.4040% (R1-A to R1-E)$856 (year not stated)
Ajax$14.22 times the floor area (the schedule doesn't print the unit)Not calculated45% (R1-C to R1-F); 30% R1-A, 33% R1-B$1,638.90 (2025 rate)
PickeringNo addition line in the 2026 scheduleNot calculated33% (R1C to R1E); 38% (R1F to R1I)$2,500 (from 1 July 2026)
UxbridgeNot verified (undated schedule)Not calculated30% (R1)$877

Note: fees from each municipality's current schedule and coverage from its zoning by-law's usual detached zone; your lot's zone may carry its own numbers, and minimum permit fees can apply to small jobs.

Coverage is where an addition hits the wall. A 600 m² lot in one of Whitby's older R1 zones can hold 120 m² of building, while the same lot in Ajax's R1-C zone could hold 270 m² (our arithmetic). When you need more, the variance bill swings too: Scugog's $2,760 is more than three times Oshawa's $856, and a Pickering lot in TRCA's regulated area could pay $2,500 plus $695, or $3,195 (our arithmetic).

The 90% setback relief has holes that matter here. The relief stops at the Greenbelt and at prescribed areas near shorelines, wetlands, valleys and railways, and Durham has its share of those, from the Lake Ontario shoreline to creek valleys such as Duffins Creek. Lots near them still need the full by-law setback or a variance.

Our nearest finished addition is West Lynde in Whitby, a bungalow taken up to two storeys. The nearest rear extension is Greenwood in Toronto, with a new top storey, roughly 27 km west of central Pickering. Its foundation got new waterproofing and weeping tile while the walls were open.

How the job runs in Durham Region

  1. Meet James

    James meets you at the house, hears what you want and gives you a rough estimate on the spot. The first estimate is free.

  2. Proposal and contract

    If the estimate works for you, James prepares a detailed proposal. The whole project is priced, and the contract signed with a 10% deposit, before any design work begins.

  3. Design onboarding

    Our designer sends you an onboarding email with some homework: your style, how your family uses the house, and what you need and want. You share Pinterest boards, then go through them together on a Zoom call: what you like in the pictures, and what you don't.

  4. Measure and floor plans

    The designer measures the house and draws the floor plan: which walls come out, where the stairs land, how new space joins the old. We go through it with you until it's confirmed.

  5. Drawings and 3D rendering

    With the plan confirmed, she draws the elevations and the millwork, then puts it all into a 3D rendering, so you see the rooms before anyone orders a cabinet.

  6. Finishes presentation

    We don't take you round the stores: there are too many options. Using what she learned in onboarding, the designer narrows the tile, flooring, quartz, plumbing fixtures and the rest to a few choices that suit your style, collects the samples and presents them to you in our office. If a selection changes the price, the change goes through a change order you sign.

  7. Permits and engineering

    We prepare the permit drawings, bring in the structural engineer wherever a beam or a load changes, and apply to the municipality. If the plan changes after the permit is issued, we file the amendment. Each municipality in Durham Region takes its own applications; the table above names where.

  8. Construction

    Our crew and trades build it, with one point of contact from demolition to the last coat of paint. Our site supervisors write a job log every day, which you can follow in our online app. When we open a wall and find a problem, you hear about it, and what it costs, before we fix it.

  9. Inspections

    The municipal building inspector checks the work at each stage the permit sets, before it gets covered up. Inspections are booked with the local building department.

  10. Handover

    We walk the finished house with you and put right anything that isn't. On one job a stair stain didn't match the new floor, so we refinished the stairs.

Credentials

Questions

Which Durham Region town allows the most lot coverage for an addition?

Ajax and Scugog are the most generous of the towns we checked. Ajax allows 45% in its R1-C to R1-F zones, and lets R1-A and R1-B lots rise to 45% when they include an accessory unit. Scugog allows 45% in its urban residential zones. In Whitby, By-law 1784 holds its older residential zones to 20%, though most of Whitby's newer subdivisions sit in other zones with their own limits.

Does Ontario's 90% setback rule apply in every Durham Region town?

On urban residential land, yes: O. Reg. 545/06 deems every minimum setback to be 90% of the zoning figure, in force since 21 November 2025, and it overrides each town's by-law. It doesn't reach Greenbelt land or areas prescribed under O. Reg. 254/23 near shorelines, wetlands, valleys and railways. The setback in force when the building permit is issued is the one that applies.

What does a conservation authority add to a minor variance in Durham Region?

It depends on which authority regulates your lot. CLOCA, which covers Whitby, Oshawa and much of Clarington, charges $930 to review a minor variance in 2026. TRCA, which covers most of Ajax and Pickering, charges $695 for a minor residential variance and $1,000 for a standard one. Both are on top of the town's own Committee of Adjustment fee.

Does an addition with its own kitchen pay development charges in Durham Region?

If the addition creates a separate home rather than enlarging yours, a different exemption applies. Durham's By-law 42-2023 waives the regional charge on up to two added units in an existing house, provided no more than three homes stand on the parcel afterwards. The school board exemption adds conditions on floor area and on the house having been occupied for at least 12 months.

How much did Durham Region spend on renovations and additions in 2025?

Durham Region's 2025 Annual Building Activity Review values permits for renovations, additions and improvements at $119.6 million in 2025, down 10.6% from $133.7 million in 2024. That was 7.3% of all residential permit value. The review doesn't break the figure down by town or separate additions from renovations.