Vaulting a ceiling means removing the flat ceiling so the room opens up to the roof. Rafters, single sloped boards rising to the peak, usually let the roof stay. Trusses, triangles joined by metal plates, usually mean a new roof. Either job needs a permit and drawings. We at Jarvis Contracting are reframing a ceiling at Lark House, as we posted on Instagram on 27 September 2026.
Key takeaways
- With rafters, the roof can often stay on. With trusses, you usually replace the whole roof structure (This Old House).
- Toronto wants a permit for structural changes. A skylight is exempt only if it removes one rafter or joist at most (City of Toronto).
- Once the vault replaces the attic, the Ontario Building Code asks for a vented gap of at least 63 mm above the insulation, unless the design shows it isn't needed (City of Markham).
- We don't publish a price for vaulting a ceiling. The framing and what's in the attic decide it, so we price it after a site visit.
Can you vault a ceiling in an existing house?
Yes, in many houses, and the framing you can see through the attic hatch tells you how big the job is. Shine a light in and look at what holds up the roof:
- Rafters: single sloped boards running from the wall up to the ridge, the peak of the roof. Flat boards below them, called ceiling joists, carry the ceiling.
- Trusses: factory-built triangles with diagonal pieces inside, joined with flat metal plates. The bottom board of each triangle is the ceiling joist, so the ceiling and the roof are one piece.
Lark House is a job we, Jarvis Contracting, are building now. The design is by Ceara at Juliette Interiors, her own design studio, which designs the jobs we build. We stripped the house back to the structure first. Then we started "re-engineering and reframing this ceiling", as our 27 September post put it. The goal is more height "without adding a single square foot".
The vault was still bare framing when we posted, so there's no finished room to show yet. For a finished vaulted room in our portfolio, see the kitchen at Coventry Residence.
Vaulting a ceiling with trusses vs rafters: what's the difference?
With rafters, the roof usually stays and the ceiling joists come out. With trusses, the ceiling joist is part of each truss, so you replace the trusses. The American magazine This Old House puts it plainly: with trusses "you'll have to remove the entire roof structure" (This Old House).
Rafters aren't free either. A rafter's weight pushes its lower end outward against the wall. In most rafter roofs, the ceiling joists are what hold those ends together, like the string on a bow.
Take the joists out and something else has to do their job. Usually that's a ridge beam or new ties, sized for your roof. A ridge beam is a structural beam along the peak that carries the top of every rafter. Ties are horizontal boards that hold the rafters together.
Here's how the two compare on the points that change the job:
| Rafter roof | Truss roof | |
|---|---|---|
| What you see in the attic | Single boards from the wall to the ridge, with flat ceiling joists below | Triangles with metal plates at the joints |
| Does the roof stay on? | Usually | Usually not; the roof structure is replaced |
| What stops the walls spreading | The ceiling joists tie the rafters' lower ends together today, so a ridge beam or new ties replace them | The truss itself; cutting it breaks the design |
| Who designs the change | An engineer or qualified designer sizes the ridge beam and ties | The truss maker designs new trusses, and your designer works out their support and bracing |
| Roofing work | Often none | A new roof over the new structure |
Note: this is the general pattern, not a reading of your roof. An engineer or designer checks it on site.
The Ontario Building Code says a roof sloped 1 in 3 or steeper can skip ridge support only when the rafters' lower ends are tied to stop them moving outward. Tie rods or ceiling joists running the full width can be those ties. Ontario's 2024 code adopts the National Building Code of Canada 2020 with Ontario amendments, and the rule is Article 9.23.14.8 there (National Building Code 2020).
Trusses are a different case. Each truss is engineered as a whole. The 2024 code requires truss design to follow engineering practice, in article 9.23.14.11 (as quoted on a permit form from the Municipality of Arran-Elderslie, Ontario). Cutting the bottom board out of an existing truss isn't a framing tweak. It means new trusses or a new engineered roof.
Do you need a permit and an engineer to vault a ceiling in Ontario?
You need a permit, and an engineer or qualified designer has to size the new structure. A vault removes every ceiling joist in the room, and Toronto lists "structural or material alterations" as work that needs a permit (City of Toronto, July 2026). Taking out ceiling joists, adding a ridge beam or replacing trusses all change the structure. Section 8 of the Building Code Act, the provincial law behind the code, requires a permit to build or demolish.
Toronto's exemptions make the line clear. A skylight needs no permit only if it removes no more than "one rafter, joist, or other similar structural member". New roofing is exempt only when "no structural work is required". A vault fails both tests.
The new beam, ties or trusses have to be sized on the permit drawings, by an engineer or a qualified designer. Mississauga has a roof truss layout review form for a professional engineer to sign. On our jobs, when we take out structure, a licensed engineer sizes it, just as with load-bearing walls on a main floor. Our architectural design team draws the permit drawings.
We build to the 2024 Ontario Building Code, and the municipality's building inspector signs the work off (licensing and warranty).
How do you insulate and ventilate a vaulted ceiling once the attic is gone?
You fit the insulation between the rafters and leave a vented air gap above it, or show that the roof doesn't need venting. A flat ceiling sits under a big, ventilated attic. A vault has no attic, so the insulation and the air gap have to share the depth of the rafters.
Markham's Builder Tip 71 lists the rules from the 2024 code. Sheathing means the boards or panels nailed over the rafters, under the shingles. Here are the rules:
| Code article (2024) | What it asks for |
|---|---|
| 9.19.1.1 | A space between the insulation and the roof sheathing, vented to the outside, "except where it can be shown to be unnecessary" |
| 9.19.1.2 | Vents spread evenly on opposite sides, with at least 25% of the openings at the top of the space and 25% at the bottom. On roofs flatter than 1 in 6 (rising 1 unit for every 6 across), or where the same joists carry the roof and the ceiling, open vent area of at least 1/150 of the insulated ceiling area (1 square metre of vent per 150 of ceiling) |
| 9.19.1.2 | 38 x 38 mm purlins (wood strips laid across the framing) so air can pass between the spaces, unless each space is vented separately |
| 9.19.1.3 | At least 63 mm (2½ in) between the top of the insulation and the sheathing |
Note: these are code minimums as one city explains them; your designer confirms which apply to your roof.
Markham says these purlins matter in "roofs without attic spaces", which "commonly includes flat roofs and cathedral ceilings". Cathedral ceiling is another name for a vaulted one. A vault is exactly that kind of roof.
Depth is the catch. This Old House notes that rafters under 5.5 inches are too shallow to insulate well "unless you use spray-in foam" (This Old House). You can deepen shallow rafters, or use spray foam as This Old House suggests; whether the roof can then skip the vented gap is something your designer has to show under the code. On Solace, a Toronto house we gutted to the studs, every cavity was open, which let us spray-foam the whole space. Solace had no vault; it shows how much easier insulation is when every cavity is open.
What happens to the wiring and ducts in the attic?
Everything in the attic has to move, so the ductwork and wiring that run through it get relocated before the ceiling opens up (This Old House). That's often where an older house hides its surprises.
Lark House had surprises behind its walls. When we stripped it back, we found a vine growing into the house and "electrical wiring that needs attention" (Instagram). Then came mould, which we removed along with the moisture source behind it. Our post on knob and tube wiring in Toronto covers older wiring.
On our jobs, a licensed electrical contractor moves the wiring, not us (licensing and warranty). Ducts that lose their attic route need a new path. That can mean a bulkhead (a boxed-in section of ceiling that hides the duct) or a new layout, so settle it in the drawings, not on site.
What drives the cost of vaulting a ceiling?
Rafters or trusses moves the price most. Trusses usually mean a new roof structure with new roofing on top. A rafter roof that stays on is a much smaller job. We don't publish a range for vaulting a ceiling; we'd rather price your attic than quote a number that fits nobody's.
Seven lines move the price of vaulting a ceiling:
| Cost driver | Why it moves the number |
|---|---|
| Rafters or trusses | Trusses usually mean a new roof structure and new roofing |
| Engineering and drawings | A ridge beam, new ties or new trusses all need sizing and permit drawings |
| Truss design | Truss design isn't in our published permit drawing prices, so it's priced separately (pricing) |
| What's in the attic | Ducts and wiring have to move |
| Insulation method | Batts (pre-cut insulation blankets) need the vented gap above them; shallow framing may need deepening or spray foam |
| Finishes | New drywall on a sloped ceiling, lighting and paint |
| Permit fee | Set by your municipality's fee schedule |
Note: these are the drivers, not prices. Every line depends on the house.
Two things keep it in check. First, do the vault while other work has the house open. As James Jarvis, who runs our construction, says on our about page, "If you can, do it all at once." Second, price it inside one fixed-price contract. We price the whole job after the site visit and sign the contract before design starts. If a design selection or finish later changes the price, it goes through a change order you sign (pricing, process).
Our post on building a realistic renovation budget lists permit fees and drawing costs, and what drawing prices leave out, such as truss design. If the vault is part of a bigger renovation, our design-build timeline shows where engineering and permits sit. The first estimate is free.
Questions
Can you vault a ceiling with trusses?
Vaulting a ceiling under a truss roof is possible, but it usually means removing the trusses, building a new roof structure and reroofing. You can't cut the bottom boards out of existing trusses, because each truss is engineered as a whole. The truss maker designs the new trusses, and your designer works out how they're supported and braced.
How do I tell if my roof has rafters or trusses?
Look through the attic hatch. Rafters are single sloped boards running from the wall to the peak, with separate flat ceiling joists below. Trusses are triangles with diagonal pieces inside and flat metal plates at the joints. If you can't tell, a designer or engineer confirms it on the site visit.
Do you need a permit to vault a ceiling in Toronto?
Yes. Vaulting a ceiling removes ceiling joists or trusses, which changes the structure, and Toronto requires a building permit for structural alterations. Its skylight exemption covers removing one rafter or joist at most. A vault removes far more than that.
Does a vaulted ceiling need ventilation?
Usually, yes. With the attic gone, the Ontario Building Code asks for a vented gap of at least 63 mm between the insulation and the roof sheathing. The exception is a roof assembly where the design shows venting isn't needed. Your designer sets out which approach your roof uses in the drawings.
Can I vault a ceiling myself?
Yes, but only with a permit and drawings that size the new structure. Removing ceiling joists changes how the roof holds the walls together, so a designer or engineer has to design the new beam or ties before you cut anything. Wiring and ducts in the attic have to move too.
Sources
- This Old House thisoldhouse.com
- City of Toronto toronto.ca
- City of Markham markhammuseum.ca
- stripped the house back to the structure instagram.com
- 27 September post instagram.com
- National Building Code 2020 nrc-publications.canada.ca
- permit form from the Municipality of Arran-Elderslie, Ontario arran-elderslie.ca