# Second-storey additions in Toronto

Family design-build firm based in Ajax · 5.0 from 30 Google reviews · BBB A+ accredited · DRHBA member · first estimate free.

**How much height does Toronto's zoning allow when I add a storey to my house?**

In the RD zone of Toronto's Zoning By-law 569-2013, a house may reach the height on the City's Height Overlay Map, or 10.0 m where the map shows none, measured from established grade to the highest point of the roof, as of October 2026. Main walls stop at 7.0 m or 2.5 m below that limit, whichever is higher, so where the limit is 10.0 m, the main walls are held to 7.5 m along a set share of their width. Toronto's zoning examiners check it before the City of Toronto issues the permit. (Checked 2026-10-13.)

## Key takeaways

- In Toronto's RD zone the maximum height is the "HT" number on the Height Overlay Map, or 10.0 m where there is none ([By-law 569-2013, s. 10.20.40.10(1)](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_20.htm)).
- Toronto measures a house's height from established grade to the highest point of the building, not to the middle of a sloped roof ([By-law 569-2013, s. 10.5.40.10(1)](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_5.htm)).
- In the RD zone, main walls may rise to the higher of 7.0 m or 2.5 m below the height limit, across at least 70% of the side walls or 40% to 60% of the front and rear walls depending on frontage ([s. 10.20.40.10(2)](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_20.htm)).
- In 2025 the City issued 278 small residential permits whose description mentions a second-storey addition and 122 that mention a third-storey addition ([Toronto open data](https://open.toronto.ca/dataset/building-permits-cleared-permits/)), our count.
- Toronto protects any private tree with a stem of 30 cm or more measured 1.4 m above the ground, and counts failing to protect it to the City's standards as injury ([Municipal Code Chapter 813](https://www.toronto.ca/legdocs/municode/1184_813.pdf)).

## Permits for this work in Toronto

| Item | What applies | Source | Checked |
|---|---|---|---|
| Where to apply | Toronto Building Online Services Application Submission Tool (email to bldapplications@toronto.ca also accepted) | [www.toronto.ca](https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/renovation-and-new-house-guides/small-residential-additions/) | 2026-10-05 |
| Addition permit fee | $18.56 per m2 of new floor area (2026) | [www.toronto.ca](https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/renovation-and-new-house-guides/small-residential-additions/) | 2026-10-05 |
| Conservation authority | Toronto and Region Conservation Authority (TRCA) | [trca.ca](https://trca.ca/planning-permits/) | 2026-10-05 |
| Zoning by-law | City-wide Zoning By-law 569-2013 (plus former municipal by-laws on some lots) | [www.toronto.ca](https://www.toronto.ca/city-government/planning-development/zoning-by-law-preliminary-zoning-reviews/zoning-bylaws/) | 2026-10-05 |
| Minor variance (Committee of Adjustment) fee | $2,228.98 flat (fees effective January 1, 2026) | [www.toronto.ca](https://www.toronto.ca/city-government/planning-development/committee-of-adjustment/forms-submission-guidelines-fees/) | 2026-10-05 |

Fees and rules as published by Toronto and the agencies linked, checked 5 October 2026. Confirm with the building department before you apply.

## The nearest finished jobs

- [Greenwood: a new top storey and rear extension in Toronto](https://www.jarviscontracting.ca/projects/greenwood): Toronto, 5 km away, 2026. Top floor replaced with a new storey, rear extension, basement enlarged, full interior design and build.
- [West Lynde: a Whitby bungalow made two storeys in 4.5 months](https://www.jarviscontracting.ca/projects/west-lynde): Whitby, 45 km away, 2023. New second storey of about 800 sq ft with two bedrooms, a walk-in closet and a bathroom; new kitchen, two new bathrooms, floors, stairs and trim below.

## What it costs

| Work | Range (CAD) | Basis | Source |
|---|---|---|---|
| Second-storey addition, 600 to 1,200 sq ft | 300000 to 800000 | GTA, 2026. The new floor; a kitchen or bathrooms below add to it. Before 13% HST. | Our 2026 price |

Our 2026 ranges, not quotes: every job is priced after a site visit.

What moves the number:
- Whether the foundation and walls can carry the new floor, or need reinforcing
- A full storey or a partial one
- Whether the main floor is redone at the same time
- The roof design and how it meets what's left
- Engineering, drawings and the permit
- Finish level, and 13% HST on top

## What our addition clients say

> "Their work quality is great and they have full confidence during town inspections." (Mamsen Sati, Google, about 4 years before October 2026)

> "a fantastic job with our major bathroom renos and an addition to our house" (Danielle Bischof, Google, about 3 years before October 2026)

> "Construction was completed on time and on budget." (fedrigo, Houzz, 5 February 2016)

## How does Toronto measure a house's height?

To the very top. Section 10.5.40.10 of [By-law 569-2013](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_5.htm) takes height from established grade to the highest point of the building, ridge included. Established grade is the average ground level at the two points where the required front yard setback line crosses the side lot lines, just past each one. A skylight may poke 1.0 m above the limit, and chimneys, vents and stair enclosures up to 5.0 m, as long as together they cover no more than 30% of the roof.

In the RD (detached) zone, the [limit](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_20.htm) is the number after "HT" on the Height Overlay Map, or 10.0 m where the map shows none. The same map can carry an "ST" number that caps storeys. Where it shows none, that rule doesn't limit storeys at all.

## Why the walls matter more than the peak

The main-wall rule is what shapes a Toronto second storey. With a 10.0 m limit, the walls may reach 7.5 m (10.0 m less 2.5 m, our arithmetic), over one of these shares:

| Lot frontage | Side walls under the limit | Or front and rear walls under the limit |
|---|---|---|
| 12.0 m or more | at least 70% of each | at least 60% |
| Over 7.5 m, under 12.0 m | at least 70% of each | at least 50% |
| 7.5 m or less | at least 70% of each | at least 40% |

Note: RD zone, s. 10.20.40.10(2), as of October 2026; other residential zones and site-specific exceptions carry different figures, and a flat roof uses 7.2 m, with any front or rear wall above that set back 1.4 m.

So the upper floor often tucks under a sloped roof, or gets dormers. Dormers on a house of two or more storeys don't count as main walls if their faces take up no more than 40% of the wall width below. On [Greenwood](https://www.jarviscontracting.ca/projects/greenwood), in the east end a short drive from City Hall, we removed the old top floor and built a new storey in its place. That floor had to sit at a set height, so the roof lines come down into the bedroom, a trade of ceiling height for floor area we talk through before drawings start.

## Who else has a say when you go up?

Protected trees come first. [Chapter 813](https://www.toronto.ca/legdocs/municode/1184_813.pdf) needs a permit before anyone injures a protected tree, and scaffolding or a new footing inside its root zone can do that. The City can demand a tree protection guarantee. A variance application needs photos of every protected tree on the lot and within 6 m of it, or 12 m in a ravine-protected area.

Heritage districts are next. Toronto has created 27 Heritage Conservation Districts since 1985. Inside one, the drawings for a storey go through Toronto Building with the permit, and Heritage Planning reviews them there.

The unit count can matter too. Four units are allowed citywide, and six in Toronto and East York District since 2025. A detached houseplex, with at least one unit above another, gets at least 10.0 m even where the overlay says less, and no "ST" storey cap. A storey that adds a unit can change the height rule.

For budgeting, our own 2026 range for a second storey of 600 to 1,200 sq ft is $300,000 to $800,000 before HST, with any work on the floor below on top.

## How the job runs in Toronto

1. **Meet James.** James meets you at the house, hears what you want and gives you a rough estimate on the spot. The first estimate is free.
2. **Proposal and contract.** If the estimate works for you, James prepares a detailed proposal. The whole project is priced, and the contract signed with a 10% deposit, before any design work begins.
3. **Design onboarding.** Our designer sends you an onboarding email with some homework: your style, how your family uses the house, and what you need and want. You share Pinterest boards, then go through them together on a Zoom call: what you like in the pictures, and what you don't.
4. **Measure and floor plans.** The designer measures the house and draws the floor plan: which walls come out, where the stairs land, how new space joins the old. We go through it with you until it's confirmed.
5. **Drawings and 3D rendering.** With the plan confirmed, she draws the elevations and the millwork, then puts it all into a 3D rendering, so you see the rooms before anyone orders a cabinet.
6. **Finishes presentation.** We don't take you round the stores: there are too many options. Using what she learned in onboarding, the designer narrows the tile, flooring, quartz, plumbing fixtures and the rest to a few choices that suit your style, collects the samples and presents them to you in our office. If a selection changes the price, the change goes through a change order you sign.
7. **Permits and engineering.** We prepare the permit drawings, bring in the structural engineer wherever a beam or a load changes, and apply to the municipality. If the plan changes after the permit is issued, we file the amendment. In Toronto, applications go through the town's online permit portal.
8. **Construction.** Our crew and trades build it, with one point of contact from demolition to the last coat of paint. Our site supervisors write a job log every day, which you can follow in our online app. When we open a wall and find a problem, you hear about it, and what it costs, before we fix it.
9. **Inspections.** The municipal building inspector checks the work at each stage the permit sets, before it gets covered up. Inspections are booked with Toronto's building department.
10. **Handover.** We walk the finished house with you and put right anything that isn't. On one job a stair stain didn't match the new floor, so we refinished the stairs.

## Credentials

- Written warranty: 1 year workmanship and materials, 2 years plumbing, heating, electrical and building envelope, 7 years structural
- BBB Accredited Business: Accredited by the Better Business Bureau since November 2025 (https://www.bbb.org/ca/on/ajax/profile/general-contractor/jarvis-contracting-inc-0107-1416595)
- Durham Region Home Builders' Association: Member, Renovators (https://www.drhba.com/Sys/PublicProfile/99587295/5125036)
- RenoMark: RenoMark renovator, through the DRHBA (https://renomark.ca/find-a-renovator/)

## Questions

### Does a duplex or triplex get more height than a single house in Toronto's RD zone?

Yes. Under By-law 569-2013, a detached houseplex in the RD zone may reach the greater of the Height Overlay Map figure or 10.0 m, and the map's storey cap doesn't apply to it. A house with a secondary suite isn't a houseplex under the by-law, so a basement apartment alone doesn't earn the extra height.

### Can a skylight on a new Toronto storey go above the height limit?

By up to 1.0 m. Toronto's By-law 569-2013 lets skylights exceed a residential building's height limit by that much, and chimneys, vents and enclosed stairs by up to 5.0 m. Together those elements can cover no more than 30% of the roof area.

### Do I need a tree permit to add a storey to my Toronto house?

You do if the work would injure or remove a private tree with a stem of 30 cm or more at 1.4 m, or any City-owned tree. Toronto's Chapter 813 counts failing to protect a tree to the City's construction standards as injury, so a new footing or scaffold inside the root zone can trigger it. The building permit application carries a Tree Declaration Form wherever trees could be harmed.

### Is a new storey in a Toronto Heritage Conservation District reviewed separately?

Not as a separate permit. For a property in one of Toronto's Heritage Conservation Districts, the drawings go to Toronto Building with the building permit application, and Heritage Planning reviews them as part of it. A house individually designated under Part IV of the Ontario Heritage Act needs a heritage permit before work starts.

### How many Toronto houses added a storey in 2025?

The City issued 278 small residential permits in 2025 whose descriptions mention a second-storey addition: 90 in Toronto and East York, 87 in Etobicoke York, 52 in North York and 49 in Scarborough, our count of the City's open data. Another 122 mention a third-storey addition. Most were filed as "Multiple Projects", so the City's own work-type labels undercount them.

## Sources

1. [City of Toronto, Zoning By-law 569-2013, Section 10.20 Residential Detached Zone (consolidation to 30 April 2026)](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_20.htm)
2. [City of Toronto, Zoning By-law 569-2013, Section 10.5 Residential Zone Category](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter10_5.htm)
3. [City of Toronto, Zoning By-law 569-2013, Chapter 800 Definitions](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter800.htm)
4. [City of Toronto Open Data, Building Permits (Cleared Permits since 2017)](https://open.toronto.ca/dataset/building-permits-cleared-permits/)
5. [Toronto Municipal Code Chapter 813, Trees](https://www.toronto.ca/legdocs/municode/1184_813.pdf)
6. [City of Toronto, Committee of Adjustment forms and fees (tree submission requirements)](https://www.toronto.ca/city-government/planning-development/committee-of-adjustment/forms-submission-guidelines-fees/)
7. [City of Toronto, Heritage Conservation Districts](https://www.toronto.ca/city-government/planning-development/heritage-preservation/heritage-conservation-districts-planning-studies/)
8. [City of Toronto, Heritage Permit Guide](https://www.toronto.ca/city-government/planning-development/heritage-preservation/heritage-permit-guide/)
9. [City of Toronto, Multiplex Housing](https://www.toronto.ca/city-government/planning-development/planning-studies-initiatives/multiplex-housing/)
10. [City of Toronto: Small residential additions](https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/renovation-and-new-house-guides/small-residential-additions/)
11. [TRCA: Planning permits](https://trca.ca/planning-permits/)
12. [City of Toronto: Zoning bylaws](https://www.toronto.ca/city-government/planning-development/zoning-by-law-preliminary-zoning-reviews/zoning-bylaws/)

## How this page was made

Written by Jarvis Contracting. Municipal facts checked 2026-10-05. Fact-checked by Space & Story on 2026-10-13.

## Keep reading

- [Second-storey additions: all areas](https://www.jarviscontracting.ca/second-storey-additions)
- [Building in Toronto](https://www.jarviscontracting.ca/areas/toronto)
- [Second-storey additions in Scarborough](https://www.jarviscontracting.ca/second-storey-additions/scarborough) (17 km away)
- [Second-storey additions in Pickering](https://www.jarviscontracting.ca/second-storey-additions/pickering) (31 km away)
- [Second-storey additions in Ajax](https://www.jarviscontracting.ca/second-storey-additions/ajax) (37 km away)
- [Home additions in Toronto](https://www.jarviscontracting.ca/home-additions/toronto)
- [How much does a home addition cost in Ontario in 2026?](https://www.jarviscontracting.ca/guides/home-addition-cost-ontario)
- [How much does a second-storey addition cost in Ontario in 2026?](https://www.jarviscontracting.ca/guides/second-storey-addition-cost-ontario)
- [Is it cheaper to build up or out? 2026 Ontario costs](https://www.jarviscontracting.ca/guides/build-up-or-out)
- [Ontario HST relief for owner-built homes and big renovations, 2026](https://www.jarviscontracting.ca/guides/ontario-hst-relief-substantial-renovation)
- [Should we add on or move? Costs compared for 2026](https://www.jarviscontracting.ca/guides/renovate-or-move)