# Second-storey additions in Scarborough

Family design-build firm based in Ajax · 5.0 from 30 Google reviews · BBB A+ accredited · DRHBA member · first estimate free.

**Who has to sign off before I add a second storey in Scarborough?**

The City of Toronto issues the building permit, but on a lot inside TRCA's regulated area, which takes in the erosion-prone Scarborough Bluffs and the creek valleys, a TRCA permit must come first, as of October 2026. TRCA's 2026 schedule puts work in an erosion hazard at a $1,490 Major base fee or higher, and a separate geotechnical review costs $2,385 to $5,365. The City issued 49 permits in Scarborough in 2025 whose descriptions mention a second-storey addition, our count of its open data. (Checked 2026-10-06.)

## Key takeaways

- TRCA names the Scarborough Bluffs as an area where erosion can damage development, and requires its own permit before a municipality issues a building permit in a regulated area ([TRCA planning and permits](https://trca.ca/planning-permits/), [TRCA, apply for a permit](https://trca.ca/planning-permits/apply-for-a-permit/)).
- TRCA's 2026 fee schedule bases its Major private residential permit, which covers additions in an erosion hazard, at $1,490, and charges $2,385 for a standard extra geotechnical and hydrogeology review ([TRCA fee schedule](https://trcaca.s3.ca-central-1.amazonaws.com/app/uploads/2026/02/25090657/Development-Permitting-Fee-Schedule-February-1-20260225.pdf)).
- In Ward 23, Scarborough North, a fifth and sixth unit may be permitted on lots zoned RD, RS, RM or RT, under amendments Council adopted on 5 February 2025 ([City of Toronto, Ward 23 Multiplex Study](https://www.toronto.ca/city-government/planning-development/planning-studies-initiatives/ward-23-multiplex-study/)).
- Toronto charges no development charges on the second, third and fourth unit on a lot, and $0 on the fifth and sixth, where no more than six are built ([By-law 845-2025](https://www.toronto.ca/legdocs/bylaws/2025/law0845.pdf)).
- Scarborough had 49 of the 278 Toronto permits in 2025 whose descriptions mention a second-storey addition, but 157 of the 316 new secondary-suite permits ([Toronto open data](https://open.toronto.ca/dataset/building-permits-cleared-permits/)), our count.

## Permits for this work in Scarborough

| Item | What applies | Source | Checked |
|---|---|---|---|
| Where to apply | Toronto Building Online Services Application Submission Tool (citywide) | [www.toronto.ca](https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/renovation-and-new-house-guides/small-residential-additions/) | 2026-10-05 |
| Addition permit fee | $18.56 per m2 of new floor area (2026) (City of Toronto rate; Scarborough is part of Toronto) | [www.toronto.ca](https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/renovation-and-new-house-guides/small-residential-additions/) | 2026-10-05 |
| Conservation authority | Toronto and Region Conservation Authority (TRCA) | [trca.ca](https://trca.ca/planning-permits/) | 2026-10-05 |
| Zoning by-law | Zoning By-law 569-2013 where in force; otherwise former Scarborough by-laws: 34 Community Zoning By-laws (e.g., Woburn 9510, Bendale 9350) and Employment District By-law 24982 | [www.toronto.ca](https://www.toronto.ca/city-government/planning-development/zoning-by-law-preliminary-zoning-reviews/zoning-bylaws/scarborough-zoning-information/) | 2026-10-05 |
| Minor variance (Committee of Adjustment) fee | $2,228.98 flat (2026) | [www.toronto.ca](https://www.toronto.ca/city-government/planning-development/committee-of-adjustment/forms-submission-guidelines-fees/) | 2026-10-05 |

Fees and rules as published by Scarborough and the agencies linked, checked 5 October 2026. Confirm with the building department before you apply.

## The nearest finished jobs

- [Greenwood: a new top storey and rear extension in Toronto](https://www.jarviscontracting.ca/projects/greenwood): Toronto, 13 km away, 2026. Top floor replaced with a new storey, rear extension, basement enlarged, full interior design and build.
- [West Lynde: a Whitby bungalow made two storeys in 4.5 months](https://www.jarviscontracting.ca/projects/west-lynde): Whitby, 29 km away, 2023. New second storey of about 800 sq ft with two bedrooms, a walk-in closet and a bathroom; new kitchen, two new bathrooms, floors, stairs and trim below.

## What it costs

| Work | Range (CAD) | Basis | Source |
|---|---|---|---|
| Second-storey addition, 600 to 1,200 sq ft | 300000 to 800000 | GTA, 2026. The new floor; a kitchen or bathrooms below add to it. Before 13% HST. | Our 2026 price |

Our 2026 ranges, not quotes: every job is priced after a site visit.

What moves the number:
- Whether the foundation and walls can carry the new floor, or need reinforcing
- A full storey or a partial one
- Whether the main floor is redone at the same time
- The roof design and how it meets what's left
- Engineering, drawings and the permit
- Finish level, and 13% HST on top

## What our addition clients say

> "Their work quality is great and they have full confidence during town inspections." (Mamsen Sati, Google, about 4 years before October 2026)

> "a fantastic job with our major bathroom renos and an addition to our house" (Danielle Bischof, Google, about 3 years before October 2026)

> "Construction was completed on time and on budget." (fedrigo, Houzz, 5 February 2016)

## Is my lot in TRCA's regulated area?

Check before anything is drawn. TRCA regulates river and stream valleys, wetlands and the Lake Ontario shoreline, and it [names the Scarborough Bluffs](https://trca.ca/planning-permits/) as a place where erosion can damage what's built. Two of its nine [watersheds](https://trca.ca/about/), Highland Creek and the Rouge River, run through Scarborough. Its Regulated Area Search takes an address and gives a first answer.

If the lot is regulated, a storey counts. TRCA treats increasing a building's size as development, and [its permit](https://trca.ca/planning-permits/apply-for-a-permit/) has to be issued before the City of Toronto's building permit. TRCA asks for a talk with one of its development planners before you apply, then a covering letter, full drawings and a legal survey. Zoning can be old here too: the shoreline neighbourhoods each had a former Scarborough community by-law, among them Birchcliff 8786, Cliffside 9364, Cliffcrest 9396, Scarborough Village 10010 and Guildwood 9676 ([569-2013, Chapter 800](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter800.htm)), and a lot still under one is measured by its rules.

## What does TRCA add to the budget near the Bluffs?

A second storey puts new load on old footings, and on a lot near an erosion hazard TRCA wants to know the ground under them is stable. [Its 2026 definitions](https://trcaca.s3.ca-central-1.amazonaws.com/app/uploads/2026/02/25090657/Development-Permitting-Fee-Schedule-February-1-20260225.pdf) put additions in an erosion hazard at Major, and major additions of more than 50% of the original ground floor at Complex. A full storey on a bungalow adds close to 100% of that floor, so expect the higher category and TRCA's added technical fees on top. The extra geotechnical and hydrogeology review runs $2,385 standard, or $3,580 to $5,365 major. TRCA decides the category, not us.

## Does Scarborough build up, or build in?

It builds in. The open data shows Scarborough taking about half of Toronto's new secondary suites and under a fifth of its second storeys:

| Year | Scarborough second-storey permits | All Toronto | Scarborough new secondary suites | All Toronto |
|---|---|---|---|---|
| 2024 | 41 | 301 | 136 | 312 |
| 2025 | 49 | 278 | 157 | 316 |
| 2026, to early October | 23 | 202 | 176 | 298 |

Note: our counts of small residential permits issued, from the City's open data downloaded 5 October 2026; the storey column counts permits whose description mentions a second-storey addition, so it misses any filed under other wording.

Ward 23 changes the sums for some owners. Units five and six are allowed there in the four low-rise zones, and By-law 845-2025 cuts their development charges to $0. On a bungalow, the upper floor is where that room comes from.

The nearest storey we've built is [Greenwood](https://www.jarviscontracting.ca/projects/greenwood), a drive of roughly 13 km into Toronto's east end, where we replaced the old top floor of a narrow brick house rather than building over a bungalow. [Stone Ridge](https://www.jarviscontracting.ca/projects/stone-ridge) and [Bellamy](https://www.jarviscontracting.ca/projects/bellamy) are closer, inside Scarborough, but one is a basement and the other a main floor opened up under the old roof, and neither proves anything about framing a new floor.

## How the job runs in Scarborough

1. **Meet James.** James meets you at the house, hears what you want and gives you a rough estimate on the spot. The first estimate is free.
2. **Proposal and contract.** If the estimate works for you, James prepares a detailed proposal. The whole project is priced, and the contract signed with a 10% deposit, before any design work begins.
3. **Design onboarding.** Our designer sends you an onboarding email with some homework: your style, how your family uses the house, and what you need and want. You share Pinterest boards, then go through them together on a Zoom call: what you like in the pictures, and what you don't.
4. **Measure and floor plans.** The designer measures the house and draws the floor plan: which walls come out, where the stairs land, how new space joins the old. We go through it with you until it's confirmed.
5. **Drawings and 3D rendering.** With the plan confirmed, she draws the elevations and the millwork, then puts it all into a 3D rendering, so you see the rooms before anyone orders a cabinet.
6. **Finishes presentation.** We don't take you round the stores: there are too many options. Using what she learned in onboarding, the designer narrows the tile, flooring, quartz, plumbing fixtures and the rest to a few choices that suit your style, collects the samples and presents them to you in our office. If a selection changes the price, the change goes through a change order you sign.
7. **Permits and engineering.** We prepare the permit drawings, bring in the structural engineer wherever a beam or a load changes, and apply to the municipality. If the plan changes after the permit is issued, we file the amendment. In Scarborough, applications go through the town's online permit portal.
8. **Construction.** Our crew and trades build it, with one point of contact from demolition to the last coat of paint. Our site supervisors write a job log every day, which you can follow in our online app. When we open a wall and find a problem, you hear about it, and what it costs, before we fix it.
9. **Inspections.** The municipal building inspector checks the work at each stage the permit sets, before it gets covered up. Inspections are booked with Scarborough's building department.
10. **Handover.** We walk the finished house with you and put right anything that isn't. On one job a stair stain didn't match the new floor, so we refinished the stairs.

## Credentials

- Written warranty: 1 year workmanship and materials, 2 years plumbing, heating, electrical and building envelope, 7 years structural
- BBB Accredited Business: Accredited by the Better Business Bureau since November 2025 (https://www.bbb.org/ca/on/ajax/profile/general-contractor/jarvis-contracting-inc-0107-1416595)
- Durham Region Home Builders' Association: Member, Renovators (https://www.drhba.com/Sys/PublicProfile/99587295/5125036)
- RenoMark: RenoMark renovator, through the DRHBA (https://renomark.ca/find-a-renovator/)

## Questions

### Do I need a TRCA permit to add a storey to a house near the Scarborough Bluffs?

Yes, when TRCA regulates the lot. TRCA counts increasing the size of a building as development, names the Scarborough Bluffs as an erosion hazard, and requires its permit before the City of Toronto issues a building permit. TRCA's online Regulated Area Search gives a first answer from your address.

### What does a TRCA geotechnical review cost for a Scarborough storey?

TRCA's fee schedule effective 1 February 2026 charges $2,385 for a standard additional geotechnical and hydrogeology review, and $3,580 to $5,365 for a major one. That's on top of the permit's own base fee, which is $1,490 for a Major private residential file and from $2,840 for a Complex one.

### Can a house in Ward 23 in Scarborough have six units?

It can, if the lot is zoned RD, RS, RM or RT. Toronto City Council adopted the Ward 23 amendments on 5 February 2025, and the City says they are in effect because no appeals were received. Elsewhere in Scarborough the citywide limit of four units applies.

### Do the fifth and sixth units in a Scarborough house pay development charges?

Not to the City of Toronto. By-law 845-2025 says development charges are not imposed on the second, third or fourth unit and are reduced to $0 for the fifth or sixth, provided no more than six units are built on the parcel. A garden or laneway suite under a deferral agreement isn't counted in the six.

### How long did a Scarborough second-storey permit take in 2025?

The median was 46 calendar days from application to issue for the 49 Scarborough permits in 2025 whose descriptions mention a second-storey addition, against 40 days for all 278 in Toronto, our count of the City of Toronto's open data. Calendar days include any time a file waited on the applicant.

## Sources

1. [TRCA, Planning and permits](https://trca.ca/planning-permits/)
2. [TRCA, Apply for a permit](https://trca.ca/planning-permits/apply-for-a-permit/)
3. [TRCA, Development Permitting Fee Schedule (1 February 2026)](https://trcaca.s3.ca-central-1.amazonaws.com/app/uploads/2026/02/25090657/Development-Permitting-Fee-Schedule-February-1-20260225.pdf)
4. [TRCA, About (watersheds)](https://trca.ca/about/)
5. [City of Toronto, Zoning By-law 569-2013, Chapter 800 Definitions (former Scarborough by-laws)](https://www.toronto.ca/zoning/bylaw_amendments/ZBL_NewProvision_Chapter800.htm)
6. [City of Toronto, Ward 23 Multiplex Study](https://www.toronto.ca/city-government/planning-development/planning-studies-initiatives/ward-23-multiplex-study/)
7. [City of Toronto, By-law 845-2025 (development charges on added units)](https://www.toronto.ca/legdocs/bylaws/2025/law0845.pdf)
8. [City of Toronto Open Data, Building Permits (Cleared Permits since 2017)](https://open.toronto.ca/dataset/building-permits-cleared-permits/)
9. [City of Toronto: Small residential additions](https://www.toronto.ca/services-payments/building-construction/building-permit/before-you-apply-for-a-building-permit/building-permit-application-guides/renovation-and-new-house-guides/small-residential-additions/)
10. [City of Toronto: Scarborough zoning information](https://www.toronto.ca/city-government/planning-development/zoning-by-law-preliminary-zoning-reviews/zoning-bylaws/scarborough-zoning-information/)
11. [City of Toronto: Forms submission guidelines fees](https://www.toronto.ca/city-government/planning-development/committee-of-adjustment/forms-submission-guidelines-fees/)

## How this page was made

Written by Jarvis Contracting. Municipal facts checked 2026-10-05. Fact-checked by Space & Story on 2026-10-06.

## Keep reading

- [Second-storey additions: all areas](https://www.jarviscontracting.ca/second-storey-additions)
- [Building in Scarborough](https://www.jarviscontracting.ca/areas/scarborough)
- [Second-storey additions in Pickering](https://www.jarviscontracting.ca/second-storey-additions/pickering) (16 km away)
- [Second-storey additions in Toronto](https://www.jarviscontracting.ca/second-storey-additions/toronto) (17 km away)
- [Second-storey additions in Ajax](https://www.jarviscontracting.ca/second-storey-additions/ajax) (21 km away)
- [Home additions in Scarborough](https://www.jarviscontracting.ca/home-additions/scarborough)
- [How much does a home addition cost in Ontario in 2026?](https://www.jarviscontracting.ca/guides/home-addition-cost-ontario)
- [How much does a second-storey addition cost in Ontario in 2026?](https://www.jarviscontracting.ca/guides/second-storey-addition-cost-ontario)
- [Is it cheaper to build up or out? 2026 Ontario costs](https://www.jarviscontracting.ca/guides/build-up-or-out)
- [Ontario HST relief for owner-built homes and big renovations, 2026](https://www.jarviscontracting.ca/guides/ontario-hst-relief-substantial-renovation)
- [Should we add on or move? Costs compared for 2026](https://www.jarviscontracting.ca/guides/renovate-or-move)